Laserfiche WebLink
A. Avoid defacing of the site area. Do not dump waste oil , fuel, rubbish , or other <br /> materials on the ground. Restore the site to condition approved by the ENGINEER . <br /> B . Replace or repair any facility, equipment, buildings, fencing, etc . damaged during <br /> work. Site cleanup shall be completed to the satisfaction of the ENGINEER. Solid <br /> waste such as subsurface fluids shall be contained so that it shall not migrate from the <br /> site or areas designated by the ENGINEER . This includes drill cuttings and debris <br /> such as wood, pipe, and hose . These materials shall be segregated and identified and <br /> removed and disposed of offsite, as approved by the ENGINEER . <br /> 4.0 PAYMENT <br /> 4 .01 GENERAL <br /> A . Payment for all work , materials, and equipment specified in this section shall be at the <br /> lump sum unit price as stated in the CONTRACTORS bid for DEMOBILIZATION . <br /> Payment shall only be made once for the site, and shall be for clean up and removal of <br /> equipment. <br /> B . A project closeout meeting is mandatory at the site following CONTRACTORS <br /> completion of Demobilization. Cost for this shall be included in the <br /> CONTRACTORS Bid for DEMOBILIZATION . <br /> END OF SECTION <br /> DEMOBILIZATION <br /> 02300-2 <br /> Ct\DOCUME— I \mikeh\LOCALS—I \Temp\Temporary Directory 2 for IRC wells Div I .zip\12-IRC_DEM0BD0C <br />