Laserfiche WebLink
SECTION 02300 <br /> DEMOBILIZATION <br /> 1 .0 GENERAL <br /> 1 . 01 WORK INCLUDED <br /> A . This section covers the work necessary to remove from the site all personnel, supplies, <br /> equipment, and site restoration and cleanup . Demobilization shall be completed <br /> within two weeks after the completion of all other site work. <br /> 2 .0 PRODUCTS <br /> 2 . 01 GENERAL <br /> A . Provide all materials and equipment required to accomplish the work as specified. <br /> B . On all questions concerning the acceptability of materials, execution of work, <br /> determination of costs, the decision of the ENGINEER shall be final and binding upon <br /> parties . <br /> C . The CONTRACTOR shall assume full responsibility for all supplies, materials, and <br /> equipment required by it for the contracted work, whether furnished by itself or other <br /> parties . <br /> 3.0 EXECUTION <br /> 3 . 01 GENERAL <br /> A . Accomplish all required work in accordance with the applicable portions of these <br /> Specifications and Parts or as approved by the ENGINEER . <br /> B . The replacement of minor obstructions and restoration of physical features, even <br /> though not shown or specifically mentioned shall be anticipated and accomplished. <br /> C . Upon leaving the site at the completion of the work, the CONTRACTOR shall clean <br /> equipment and materials of surface and subsurface materials contacted at the site. <br /> 3 . 02 CLEANUP OF CONSTRUCTION AREAS <br /> DEMOBILIZATION <br /> 02300- 1 <br /> CADOCUME- 1 \mikeh\LOCALS— I UemplTemporary Directory 2 for IRC wells Div ] .zip\ ) 21RC_DEMORDOC <br />