My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . 4 .2 In the event that samples analyzed exceed IRCHD standards, the <br /> CONTRACTOR may elect to either 1 ) continue sampling until two <br /> sequential samples meet disinfection standards, or 2) discontinue testing, <br /> re-disinfect the well , and start the testing procedure over. <br /> 2 .4 . 3 It is the responsibility of the CONTRACTOR to properly dispose of the <br /> disinfected well water. <br /> 2 .4. 4 Upon successful completion of the bacterial clearance, the <br /> CONTRACTOR shall provide the ENGINEER with all sampling records, <br /> including sampling time, date, collector name, and lab analyses results . <br /> 2 .5 CAPPING <br /> 3 . 6. 1 Bolt blind flange to flange after the well has been constructed, tested, and <br /> disinfected (if requested) . <br /> 4.0 PAYMENT <br /> 4 . 1 GENERAL <br /> 4 . 1 . 1 Payment for all work and materials specified in this section for capping <br /> the production well shall be at the lump sum price as stated in the <br /> CONTRACTORS bid schedule and described in the Measurement and <br /> Payment Section of these documents for Wellhead Completion . <br /> 4 . 1 . 2 Payment for all work and materials specified in this section for well <br /> disinfection, laboratory analysis of total coliform water samples, and <br /> disposal of disinfection water shall be at the lump sum price as stated in <br /> the CONTRACTORs bid schedule and described in the Measurement and <br /> Payment Section of these documents for Well Disinfection . <br /> END OF SECTION <br /> Wellhead Completion <br /> 02250- 2 <br /> C\DOCUME— I \mikeh\LOCALS— I \Temp\Temporary Directory I for IRC wells Div I .zip\I IARC_Wellheadl.doc <br /> 10/17/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.