Laserfiche WebLink
2 . 4 .2 In the event that samples analyzed exceed IRCHD standards, the <br /> CONTRACTOR may elect to either 1 ) continue sampling until two <br /> sequential samples meet disinfection standards, or 2) discontinue testing, <br /> re-disinfect the well , and start the testing procedure over. <br /> 2 .4 . 3 It is the responsibility of the CONTRACTOR to properly dispose of the <br /> disinfected well water. <br /> 2 .4. 4 Upon successful completion of the bacterial clearance, the <br /> CONTRACTOR shall provide the ENGINEER with all sampling records, <br /> including sampling time, date, collector name, and lab analyses results . <br /> 2 .5 CAPPING <br /> 3 . 6. 1 Bolt blind flange to flange after the well has been constructed, tested, and <br /> disinfected (if requested) . <br /> 4.0 PAYMENT <br /> 4 . 1 GENERAL <br /> 4 . 1 . 1 Payment for all work and materials specified in this section for capping <br /> the production well shall be at the lump sum price as stated in the <br /> CONTRACTORS bid schedule and described in the Measurement and <br /> Payment Section of these documents for Wellhead Completion . <br /> 4 . 1 . 2 Payment for all work and materials specified in this section for well <br /> disinfection, laboratory analysis of total coliform water samples, and <br /> disposal of disinfection water shall be at the lump sum price as stated in <br /> the CONTRACTORs bid schedule and described in the Measurement and <br /> Payment Section of these documents for Well Disinfection . <br /> END OF SECTION <br /> Wellhead Completion <br /> 02250- 2 <br /> C\DOCUME— I \mikeh\LOCALS— I \Temp\Temporary Directory I for IRC wells Div I .zip\I IARC_Wellheadl.doc <br /> 10/17/07 <br />