high capacity pumping is complete. <br /> 3 . 1 . 2 The static water level in the well shall be allowed to recover for a time <br /> equal to the pumping development time before start of the Variable- <br /> Rate Specific Capacity Test. <br /> 3 .2 PUMP REMOVAL : Do not remove the pump and appurtenant equipment <br /> until the work is complete as specified in Section PUMPING TESTS and as <br /> approved by the ENGINEER . <br /> 3 . 3 DISPOSAL OF WATER: Disposition of well development water is the <br /> responsibility of the CONTRACTOR. All water produced shall be settled of <br /> excess solids and conveyed away from the well in an environmentally safe <br /> manner and as directed by the ENGINEER. A discharge line of sufficient <br /> length and diameter as specified in Section 02200 - PUMPING TEST shall be <br /> provided by the CONTRACTOR to convey the development water to an <br /> approved location . <br /> 4.0 PAYMENT <br /> 4. 1 HOURLY DEVELOPMENT : Payment for development of the well shall be <br /> made at the unit price per hour, to the nearest half-hour, as stated in the <br /> CONTRACTOR ' s Bid for WELL DEVELOPMENT. The CONTRACTOR <br /> shall not be paid the hourly rate for development during the time the <br /> equipment is not actually in use for development of the well , or for any <br /> equipment repair, or for any time, in the opinion of the ENGINEER, that the <br /> development procedure is not being accomplished in accordance with these <br /> Specifications, its direction, or both . Payment at the hourly rate shall <br /> constitute full compensation for all labor, materials, and equipment specified <br /> in this section. <br /> 4. 2 PUMP EQUIPMENT INSTALLATION : Payment for pump equipment <br /> installation is specified in Section 02200 PUMPING TEST. <br /> C\DOCUME- I \MIKEH\LOCALS- I \TEMP\TEMPORARY DIRECTORY 4 FOR IRC WELLS DIV I .ZIP\ I4- <br /> IRC_DEVELOPMENT.DOC <br />