not involve a change in the Contract Price or the Contract duration of the activities comprising the Contractor's plan
<br /> Times. to accomplish the Work within the Contract Times.
<br /> 21 . General Requirements--Sections of Division 1 of 33 . Project--The total construction of which the
<br /> the Specifications. The General Requirements pertain to Work to be performed under the Contract Documents may
<br /> all sections of the Specifications. be the whole, or a part.
<br /> 22. Hazardous Environmental Condition--The 34. Project Manual--The bound documentary
<br /> presence at the Site of Asbestos, PCBs, Petroleum, information prepared for bidding and constructing the
<br /> Hazardous Waste, or Radioactive Material in such Work . A listing of the contents of the Project Manual,
<br /> quantities or circumstances that may present a substantial which may be bound in one or more volumes, is
<br /> danger to persons or property exposed thereto in contained in the tablets) of contents.
<br /> connection with the Work.
<br /> 35 . Radioactive Material--Source, special nuclear, or
<br /> 23. Hazardous Waste--The term Hazardous Waste byproduct material as defined by the Atomic Energy Act
<br /> shall have the meaning provided in Section 1004 of the of 1954 (42 USC Section 2011 et seq.) as amended from
<br /> Solid Waste Disposal Act (42 USC Section 6903) as time to time.
<br /> amended from time to time.
<br /> 36. Related Entity -- An officer, director, partner,
<br /> 24. Laws and Regulations, Laws or Regulations-- employee, agent, consultant, or subcontractor.
<br /> Any and all applicable laws, rules, regulations, ordinanc-
<br /> es, codes, and orders of any and all governmental bodies, 37 . Resident Project Representative--The authorized
<br /> agencies, authorities, and courts having jurisdiction. representative of Engineer who may be assigned to the
<br /> Site orally part thereof.
<br /> 25 . Liens--Charges, security interests, or
<br /> encumbrances upon Project funds, real property, or 38. Samples--Physical examples of materials,
<br /> personal property. equipment, or workmanship that are representative of
<br /> some portion of the Work and which establish the
<br /> 26. Milestone--A principal event specified in the standards by which such portion of the Work will be
<br /> Contract Documents relating to an intermediate comple- judged.
<br /> tion date or time prior to Substantial Completion of all the
<br /> Work. 39. Schedule of Submittals--A schedule, prepared
<br /> and maintained by Contractor, of required submittals and
<br /> 27 . Notice of Award—The written notice by Owner the time requirements to support scheduled performance
<br /> to the Successful Bidder stating that upon timely of related construction activities.
<br /> compliance by the Successful Bidder with the conditions
<br /> precedent listed therein, Owner will sign and deliver the 40. Schedule of Values--A schedule, prepared and
<br /> Agreement. maintained by Contractor, allocating portions of the
<br /> Contract Price to various portions of the Work and used
<br /> 28. Notice to Proceed--A written notice given by as the basis for reviewing Contractor' s Applications for
<br /> Owner to Contractor fixing the date on which the Con- Payment.
<br /> tract Times will commence to run and on which
<br /> Contractor shall start to perform the Work under the 41 . Shop Drawings--All drawings, diagrams,
<br /> Contract Documents. illustrations, schedules, and other data or information
<br /> which are specifically prepared or assembled by or for
<br /> 29. Owner--The individual or entity with whom Contractor and submitted by Contractor to illustrate some
<br /> Contractor has entered into the Agreement and for whom portion of the Work.
<br /> the Work is to be performed .
<br /> 42 . Site--Lands or areas indicated in the Contract
<br /> 30. PCBs--Polychlorinated biphenyls. Documents as being famished by Owner upon which the
<br /> Work is to be performed, including rights-of-way and
<br /> 31 . Petroleum--Petroleum, including crude oil or any easements for access thereto, and such other lands
<br /> fraction thereof which is liquid at standard conditions of furnished by Owner which are designated for the use of
<br /> temperature and pressure (60 degrees Fahrenheit and 14.7 Contractor.
<br /> pounds per square inch absolute), such as oil, petroleum,
<br /> fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil
<br /> mixed with other non-Hazardous Waste and crude oils.
<br /> 32. Progress Schedule--A schedule, prepared and
<br /> maintained by Contractor, describing the sequence and
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.