Laserfiche WebLink
43 . Specifications--That part of the Contract Engineer ordering an addition, deletion, or revision in the <br /> Documents consisting of written requirements for Work, or responding to differing or unforeseen subsurface <br /> materials, equipment, systems, standards and or physical conditions under which the Work is to be <br /> workmanship as applied to the Work, and certain performed or to emergencies . A Work Change Directive <br /> administrative requirements . and procedural matters will not change the Contract Price or the Contract Times <br /> applicable thereto. but is evidence that the parties expect that the change <br /> ordered or documented by a Work Change Directive will <br /> be incorporated in a subsequently issued Change Order <br /> 44. Subcontractor--An individual or entity having a following negotiations by the parties as to its effect, if <br /> direct contract with Contractor or with any other any, on the Contract Price or Contract Times. <br /> Subcontractor for the performance of a part of the Work <br /> at the Site. 1 .02 Terminology <br /> 45 . Substantial Completion--The time at which the A. The following words or terms are not defined but, <br /> Work (or a specified part thereof) has progressed to the when used in the Bidding Requirements or Contract <br /> point where, in the opinion of Engineer, the Work (or a Documents, have the following meaning. <br /> specified part thereof) is sufficiently complete, in <br /> accordance with the Contract Documents, so that the B. Intent of Certain Terms or Adjectives <br /> Work (or a specified part thereof) can be utilized for the <br /> purposes for which it is intended. The terms "substantially 1 . The Contract Documents include the terms "as <br /> complete" and "substantially completed" as applied to all allowed;. "as approved," "as ordered", "as directed" <br /> or part of the Work refer to Substantial Completion or terms of like effect or import to authorize an <br /> thereoff exercise of professional judgment by Engineer. In <br /> addition, the adjectives "reasonable," "suitable," <br /> 46. Successful Bidder--The Bidder submitting a "acceptable;' "proper," "satisfactory," or adjectives <br /> responsive Bid to whom Owner makes an award. of like effect or import are used to describe an action <br /> or determination of Engineer as to the Work. It is <br /> 47. Supplementary Conditions--That part of the intended that such exercise of professional judgment, <br /> Contract Documents which amends or supplements these action or determination will be solely to evaluate, in <br /> General Conditions. general , the Work for compliance with the require- <br /> ments of and information in the Contract Documents <br /> 48. Supplier--A manufacturer, fabricator, supplier, and conformance with the design concept of the com- <br /> distributor, materialman, or vendor having a direct pleted Project as a functioning whole as shown or <br /> contract with Contractor or with any Subcontractor to indicated in the Contract Documents (unless there is <br /> furnish materials or equipment to be incorporated in the a specific statement indicating otherwise). The use of <br /> Work by Contractor or any Subcontractor. any such term or adjective is not intended to and shall <br /> not be effective to assign to Engineer any duty or <br /> 49. Underground Facilities--All underground authority to supervise or direct the performance of <br /> pipelines, conduits, ducts, cables, wires, manholes, vaults, the Work or any duty or authority to undertake <br /> tanks, tunnels, or other such facilities or attachments, and responsibility contrary to the provisions of Paragraph <br /> any encasements containing such facilities, including 9.09 or any other provision of the Contract <br /> those that convey electricity, gases, steam, liquid Documents. <br /> petroleum products, telephone or other communications, <br /> cable television, water, wastewater, storm water, other C. Day <br /> liquids or chemicals, or traffic or other control systems. <br /> 1 . The word "day" means a calendar day of 24 <br /> 50. Unit Price Work--Work to be paid for on the hours measured from midnight to the next <br /> basis of unit prices. midnight. <br /> 51 . Work--The entire construction or the various D. Defective <br /> separately identifiable parts thereof required to be <br /> provided under the Contract Documents. Work includes 1 . The word "defective," when modifying the word <br /> and is the result of performing or providing all labor, "Work," refers to Work that is unsatisfactory, <br /> services, and documentation necessary to produce such faulty, or deficient in that it: <br /> construction, and furnishing, installing, and incorporating <br /> all materials and equipment into such construction, all as a. does not conform to the Contract Documents, <br /> required by the Contract Documents. or <br /> 52. Work Change Directive--A written statement to b. does not meet the requirements of any <br /> Contractor issued on or after the Effective Date of the applicable inspection, reference standard, test, or <br /> Agreement and signed by Owner and recommended by <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright D 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 8 <br />