responsible for the accuracy or completeness of any such information or data, and the Contractor shall have <br /> full responsibility for requesting, reviewing, and checking all such information and data. <br /> Sc 4.03A Delete 4.03 A of the General Conditions in its entirety and replace it with the following : <br /> A . Notice. The Contractor shall promptly, and before such conditions are disturbed, and in no event later <br /> than 10 days after first observance of the conditions. Notify the Owner and Engineer in writing of: ( 1 ) <br /> subsurface or latent physical conditions at the site differing materially from those indicated in this <br /> Contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially from <br /> those ordinarily encountered and generally recognized as inherent in Work of the character provided for in <br /> this Contract. The Owner will promptly investigate the conditions, and if it finds that such conditions do <br /> materially so differ and cause an increase or decrease in the Contractor' s cost of, or the time required for, <br /> performance of any part of the Work under this Contract, a Change Order shall be issued accordingly <br /> based on the Schedule of Values and executed by the Owner and the Contractor. Contractor' s failure to <br /> Provide notice upon discovery of the differing site condition shall waive any entitlement to such an <br /> adjustment in the Contract Price or Contract Time. Further, no Claim of the Contractor under this <br /> paragraph 4.03A shall be allowed unless the Contractor has given the notice as required in this paragraph <br /> 4.03A . <br /> SC 4.03C 1 Delete subparagraph 4 .03C 1 of the General Conditions in its entirety. <br /> SC 4.03 -C . 3 : Delete the words: "arbitration or" in line 10 of paragraph 4.03 -C. 3 of the General <br /> Conditions. <br /> SC-4.05A . <br /> Add the following new paragraph immediately after paragraph 4. 05A. of the General Conditions to read as <br /> follows: <br /> B. RESIDENT PROJECT REPRESENTATIVE may check the lines, elevations, reference marks, batter <br /> boards, etc . , set by Contractor, and Contractor shall correct any errors disclosed by such check. Such a <br /> check shall not be considered as approval of Contractor's work and shall not relieve Contractor of the <br /> responsibility for accurate construction of the entire Work. Contractor shall furnish personnel to assist <br /> RESIDENT PROJECT REPRESENTATIVE in checking lines and grades. <br /> SC 4.06D Delete the last sentence of paragraph 4.06D of the General Conditions in its entirety <br /> SC 4.06G Delete paragraph 4. 06G of the General Conditions in its entirety. <br /> ARTICLE 5 - BONDS AND INSURANCE <br /> SC 5 .01A Add the following sentence immediately after the existing text in paragraph 5 .OIA of the <br /> General Conditions : <br /> Pursuant to Florida Statutes section 255. 05 ( 1 )(a) (2005 ), any claimant (as such term is defined in Florida <br /> Statutes section 713 .01 ) may apply to Indian River County as Owner for copies of the Agreement and the <br /> recorded payment and performance bonds and shall thereupon be furnished with certified copies of such <br /> documents . <br /> SC 5 .0313 Delete existing paragraph 5 .0313 of the General Conditions in its entirety <br /> 6706-43015 - 155\ 10/ 17/07 00800-5 V RB <br />