SC 9 . 08-A . Delete the second sentence of 9 . 08A of the General Conditions in its entirety and replace with <br /> the following : <br /> Except for: (a) Claims for differing substutace or physical conditions governed by paragraph 4 .03 ; and ( b) <br /> claims for time extensions governed by paragraph 12 . 03 , all matters in question and other matters between <br /> Owner and Contractor arising prior to the date final payment is due, relating to the acceptability of the <br /> Work and the interpretation of the requirements of the contract documents pertaining to the performance of <br /> the Work , will be referred initially to Engineer in writing within 15 days after occurrence of the event <br /> giving rise to such Claim or within 15 days after the claimant first recognizes the condition giving rise to <br /> the Claim , whichever is later; provided, however, the Owner shall make all final determination of such <br /> matters. <br /> SC 9 .08-C Delete paragraph 9 . 08-C of the General Conditions in its entirety <br /> SC 9 . 08-D Delete paragraph 9 . 08-D of the General Conditions in its entirety <br /> SC 10 . 03 A .3 Delete subparagraph 10.03 . A. 3 of the General Conditions in its entirety <br /> SC 10 .05 .A Delete paragraph 10. 05 .A of the General Conditions in its entirety and replace with the <br /> following: <br /> A. All Claims shall initially be referred to the Engineer for decision . <br /> SC 10 .05 .13 Delete paragraph 10. 05 . 13 of the General Conditions in its entirety and replace with the <br /> following: <br /> Except for: (a) Claims for differing subsurface or physical conditions governed by paragraph 4.03 ; and (b) <br /> claims for time extensions governed by paragraph 12 . 03 , Claims by either party shall be initiated within 15 <br /> days after occurrence of the event giving rise to such Claim or within 15 days after the claimant first <br /> recognizes the condition giving rise to the Claim, whichever is later, by written notice of the amount or <br /> extent of the Claim, dispute, or other matter with supporting data to the Engineer and the other party by <br /> written notice stating the general nature of each Claim, dispute, or other matter delivered by the claimant to <br /> Engineer and the other party to the Contract. A Claim for an adjustment in Contract Price shall be prepared in <br /> accordance with the provisions of paragraph 12 .01 .13 . A Claim for an adjustment in Contract Time shall be <br /> prepared in accordance with the provisions of paragraph 12 .02.13 . No claim by the Contractor for an equitable <br /> adjustment hereunder shall be allowed if asserted after final payment under this Contract. <br /> SC 10 .05 C Delete paragraph 10 .05C of the General Conditions in its entirety. <br /> SC 10. 05 D and E Delete paragraphs 10.05 .1) and E of the General Conditions in their entirety <br /> ARTICLE 1 I - COST OF THE WORK; ALLOWANCES ; UNIT PRICE WORK <br /> SC- 11 .02A Delete paragraph 11 .02 .A of the General Conditions in its entirety and replace with the <br /> following: <br /> It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the <br /> Contract Documents and shall cause the Work so covered to be performed for such sums as may be <br /> acceptable to OWNER. <br /> 6706-43015 - 155\ 10/ 17/07 00800- 11 VRB <br />