Delete paragraphs 11 .0213 through D of the General Conditions in their entirety. <br /> ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES <br /> SC 12 . 01 C Delete " 15 percent' in line 2 of paragraph 12 .01 C2 . a of the General Conditions and replace <br /> with " 10 percent' . <br /> SC12 .01C Delete " 15 percent" in line 6 of paragraph 12 . 01C . 2 .c of the General Conditions and replace <br /> with " 10 percent'. <br /> 12 .03A and B Delete paragraphs 12 .03 .A and 12 .0313 of the General Conditions in their entirety and <br /> replace with the following: <br /> A . Where Contractor is delayed or prevented from completing any part of the Work within the <br /> Contract Times due to delay beyond the control of Contractor, the Contract Times (or Milestones) will be <br /> extended in an amount equal to the time lost due to such delay if ( 1 ) a Claim is made therefore as provided <br /> in paragraph 12 .02 .A and (2) Contractor provides evidence that the delay impacted the critical path of the <br /> Project. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by <br /> Owner, acts or neglect of utility owners or other contractors performing other work as contemplated by <br /> Article 7, Fres, floods, abnormal weather conditions or acts of God. The Contractor must request the <br /> extension of time in writing and must provide the following information within the time periods stated <br /> hereafter. Failure to submit such information and in compliance with the time requirements hereinafter <br /> stated, shall constitute a waiver by the Contractor and a denial of the claim for extension of time : <br /> 1 . Nature of the delay or change in the Work; <br /> 2 . Dates of commencement and cessation of the delay or change in the Work; <br /> 3 . Activities on the current progress schedule affected by the delay or change in the Work; <br /> 4 . Identification and demonstration that the delay or change in Work affects the critical path; <br /> 5 . Identification of the source of delay or change in the Work; <br /> 6 . Anticipated extent of the delay or change in the Work; and <br /> 7 . Recommended action to minimize the delay. <br /> B . Contractor hereby affirms that the extension of time granted herein is the Contractor's sole and exclusive <br /> remedy. Apart from extension of time, no payment or claim for damages shall be made to the Contractor as <br /> compensation for damages for any delays or hindrances from any cause whatsoever in the progress of the <br /> Work whether such delay is avoidable or unavoidable . <br /> SC 12 .03C Delete paragraph 12 .03 . 0 of the General Conditions in its entirety. <br /> SC 12 . 03D Delete paragraph 12 .03D of the General Conditions in its entirety and replace with the <br /> following: <br /> In no event shall Owner, Engineer, or the Related Entities of either of them be liable to Contractor, any <br /> Subcontractor, any Supplier, any other person or organization, or any surety for or employee or agent of <br /> any of them, for any claim, cost, loss, or damages of any nature whatsoever arising out of or resulting from <br /> delays. <br /> ARTICLE 13 - TESTS AND INSPECTIONS ; CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> DEFECTIVE WORK <br /> 6706-43015 - 155\ 10/ 17/07 00800- 12 VRB <br />