Laserfiche WebLink
PERMITTEE: Indian River (,vunty Utilities <br /> 1840 25th Street PERMI1 1IUM>3ER: FL0041637 <br /> EXPIRATION DATE: July 22, 2004 <br /> Vero Beach, FL 32960 IRCUD/WestRegional WWTF <br /> 17. Reclaimed water shall only be released to system storage or the reuse systemsin compliance with the <br /> approved operating protocol. [62-610. 462(2), 1-9-96] <br /> 18 . Discharge of reclaimed water to the northeast pond at the Vista Plantation Golf Course shall only occur <br /> when the elevation of the water in the pond is less than or equal to 16. 0 ft. NGVD . A list of all days <br /> during a month on which discharges from the northwest pond overflow we to the adjacent canal <br /> thence to the Indian River Lagoon occurred shall be attached to the DMR form. For each day on which <br /> discharge occurred, the approximate number of hours of discharge shall be noted. [62- <br /> 620. 320(6), 114944] <br /> 19. Overflows from emergency discharge facilities on storage or percolation ponds shall be reported as an <br /> abnormal event to the Department's Central District Office within 24 hours of an occurrence as an <br /> abnormal event. The provisions of Rule 62-610. 800(9), F.A. C., shall be met. [62410. 800(9), 1-9-961 <br /> Part IV Rapid Infiltration Basins <br /> 20. All ground water quality criteria specified in Chapter 62-520, F.A.C., shall be met at the edge of the <br /> zone of discharge.. . The zone of discharge for this project shall extend horizontally 100 feet from the <br /> application site or to the facility' s property line, whichever is less, and vertically to the base of the <br /> surf cial aquifer. [62-520. 200(23), 12446] [62-522. 400 and 62-522. 410, 12-946] <br /> 21 . Advisory signs shall be posted around the site boundaries to designate the nature of the project area. <br /> [62410. 5181 1446] <br /> 22. The annual average hydraulic loading rate shall be limited to a maximum of 0.7 inches per day (as <br /> applied to the entire bottom area). [62410. 523(3), 1446] <br /> 23 . Rapid infiltration basins, or trenches normally shall be loaded for 7 days and shall be rested for 7 days. <br /> Infiltration ponds, basins, or trenches shall be allowed to dry during the resting portion of the cycle. <br /> [62410. 523(4), 14-96] <br /> 24. Rapid infiltration basins shall be routinely maintained to control vegetation growth and to maintain <br /> percolation capability by scarification or removal of deposited solids. Basin bottoms shall be <br /> maintained to be level. [62410. 523(6) and (7), 1446] <br /> i 25 . Routine aquatic weed control and regular maintenance of storage pond embanlanents and access areas <br /> are required. [62-610. 514 and 62410. 414, 14461 <br /> 26. Overflows from emergency discharge facilities on storage ponds or on infiltration ponds, basins, or <br /> trenches shall be reported as an abnormal event to the Department's Central District Office within 24 <br /> hours of an occurrence as an abnormal event. The provisions of Rule 62-610 . 800(9), F.A.C., shall be <br /> met. [62-610. 800(9), 1-946] <br /> V. OPERATION AND MAINTENANCE REQUIREMENTS <br /> Staffing Requirements <br /> 1 . During the period of operation authorized by this permit, the wastewater facilities shall be operated <br /> under the supervision of a(n) operator(s) certified in accordance with Chapter 61131241 , F.A. C. In <br /> accordance with Chapter 62-699, F.A. C. , this facility is a Category I, Class B facility and, at a <br /> minimum, operators with appropriate certification must be on the site as follows : <br /> 20 D.E.P: - ORLANDO <br /> EDIT NO. 2 <br />