Laserfiche WebLink
r <br /> PERMITTEE: Indian River (._ ..aty Utilities PERMIT LIMBER: <br /> 1840 25th Street FL0041637 <br /> Vero Beach, FL 32960 EXPIRATION DATE: July 22, 2004 <br /> IRCUD/West Regional WWTF <br /> A Class C or higher operator, on-site, b h.ours/day for 7 da <br /> B. Acceptable quality reclaimed water may be diverted to reuse sto storage or the public ak, The lead Operator s a sust reuse lass <br /> systems at all times contingent upon the following: (a) Automatic computer/telemetry controls, <br /> monitoring equipment and automatic diversion equipment must be in operation and functional at all <br /> times including weekends and holidays, and (b) a Class C certified operator, or higher, must be <br /> available by phone or pager at all times when not in attendance at the treatment plant site. <br /> 162-620. 630(3), 12-24-96] [62-699. 310, S-20-92) [62-610. 462, 1-9-96] <br /> 2. The lead operator shall be on duty for one full shift each duty day (If the requested variance is <br /> approved by the Department, duty day shall be defined as 5 days per week]. A certified operator shall <br /> be on-site and in charge of each required shit} and for periods of required staffing time when the lead <br /> operator is not on-site. [62-699. 311 (10) and (5), 5-20-92] <br /> Capacity Analysts and Operation and Maintenance Performance Report Requirements <br /> 3 . The application to renew this permit shall include an u dated <br /> accordance with Rule 62-600.405, F.A.C. [62-600. 405(5), 12 4_9acity mys� report prepared in <br /> 4. The application to renew this permit shall include a detailed operation and maintenance performance <br /> report prepared in accordance with Rule 62-600. 735, F.A.C. [62400. 735(1), 124446] <br /> Record Keeping Requirements <br /> 5. The permittee shall maintain the following records and make them available for inspection on the site <br /> of the permitted facility: <br /> a. Records of all compliance monitoring information, including all calibration and maintenance <br /> records and all original strip chart recordings <br /> copy of the laboratory certification showing for continuous monitoring instrumentation and a <br /> the certification number of the laboratory, for at least <br /> three years from the date the sample or measurement was taken; <br /> b. Copies of all reports required by the permit for at least three years from the date the report was <br /> prepared; <br /> c. Records of all data, including reports and documents, used to complete the application for the <br /> Permit for at least three years from the date the application was filed; <br /> d. Monitoring information, including a copy of the laboratory certification showing the laboratory <br /> certification number; related to the residuals use and disposal activities for the time period set forth <br /> in Chapter 62-640, F.A.C., for at least three years from the date of sampling or measurement; <br /> e. A copy of the current permit; <br /> f. A copy of the current operation and maintenance manual as required by Chapter 62.600, . F.A.C. ; <br /> g. A copy of the facility record drawings; <br /> h. Copies of the licenses of the current certified operators; and <br /> i. Copies of the logs and schedules showing plant operations and equipment maintenance for three <br /> years from the date of the logs or schedules. The logs shall, at a minimum, include identification <br /> of the plant; the signature and certification number of the operator(s) and the signature of the <br /> 21 D.E.P. - ORLANDO - <br /> EXHIBIT N09 2 <br />