Laserfiche WebLink
Assumptions <br /> 0 The Reclaimed Water and Effluent Disposal section of the Master Plan is considered to be <br /> maximum level of reuse by FDEP <br /> • The customer base , recommendations , and costs outlined in the Reclaimed Water and Effluent <br /> Disposal section of the Master Plan are used in the Reuse Feasibility Report <br /> • No additional hydraulic modeling will be conducted by the Engineer <br /> • Any significant increase in the level of effort required by FDEP from this scope of services will <br /> be addressed via an addendum to this scope of services <br /> Schedule <br /> Work will be completed within 60 days of notice to proceed by the COUNTY. <br /> Compensation <br /> Compensation for Work Order No . 1 will be based on the Billing Rates by Grade from Exhibit 2 in <br /> Master Agreement with a Not To Exceed limit of $ 9 , 956 . 00 . <br /> Page 3 of 4 <br /> • t <br /> CADocuments and Settings\md16I52\LocaI Settings\Temporary Intemet Files\OLK2\IRC_ReuseStudy_SOS.doc <br />