My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-150
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 10:36:38 AM
Creation date
9/30/2015 7:49:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/22/2004
Control Number
2004-150
Agenda Item Number
11.I.2
Entity Name
Kimley-Horn Associates
Subject
Roadway Improvements
Area
East CR 510 and North A1A
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3947
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER is to evaluate the opportunity to construct a slip lane that will allow eastbound <br /> CR 510 vehicular traffic to egress onto Wabasso Island Lane . In addition to the eastbound <br /> right turn lane on CR 510, the COUNTY desires to construct a westbound right turn lane at <br /> the entrance to the Marsh Island Development. <br /> 8, CR 510 Roadway Improvements (2, 700 ft. ) — the COUNTY desires to construct a bi- <br /> directional tum lane on CR 510 approximately between Orchid Island Drive and Jungle Trail . <br /> The bi-directional turn lane will connect to existing three lane roadway sections at both ends <br /> of the roadway improvement. The COUNTY also desires to evaluate alternative roadway <br /> improvements to the horizontal curve on CR 510 immediately east of the intercoastal <br /> waterway bridge . Potential improvements to the roadway in the vicinity of the horizontal <br /> curve will be median additions, pavement widening and signing and marking improvements. <br /> SECTION II - COUNTY OBLIGATIONS <br /> The COUNTY agrees to provide (in a timely manner) the following material, data, or services as <br /> required in connection with the work to be performed under this Agreement; all of which information the <br /> ENGINEER may use and reasonably rely upon: <br /> A. Provide the ENGINEER with a copy of all previously conducted studies, geotechnical <br /> investigations, traffic counts, preliminary data or reports available, existing location <br /> surveys, topographic surveys, and related documents. <br /> B . Provide the ENGINEER with all available drawings, right-of-way maps, and other <br /> documents in the possession of the COUNTY pertinent to the project. <br /> C . The COUNTY shall be responsible for acquiring all right-of-ways, easements and other <br /> rights in land as necessary to complete the project. <br /> D . The COUNTY shall make provisions for the ENGINEER to enter upon public and private <br /> property as required for the ENGINEER to perform his services . <br /> E . The COUNTY will promptly execute all permit applications and provide application fees <br /> necessary to expedite the acquisition of any local, state or federal permits made necessary <br /> by the project. <br /> F . The COUNTY shall provide all right-of-way maps, parcel sketches, legal descriptions, and <br /> abstracts of title for each parcel necessary for the road construction. <br /> SECTION III - SCOPE OF SERVICES <br /> The ENGINEER agrees to perform professional roadway design and related services in connection <br /> with the project as required and set forth in the following: <br /> A. General <br /> 1 . The ENGINEER will endeavor not to duplicate any previous work done on the <br /> project. After issuance of written authorization to proceed, the ENGINEER shall <br /> consult with the COUNTY to clarify and define the COUNTY'S requirements for <br /> the project and review all available data. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.