My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-150
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 10:36:38 AM
Creation date
9/30/2015 7:49:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/22/2004
Control Number
2004-150
Agenda Item Number
11.I.2
Entity Name
Kimley-Horn Associates
Subject
Roadway Improvements
Area
East CR 510 and North A1A
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3947
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
way. <br /> 8. CR 510 Roadway Improvements — the DESIGN LIMITS shall extend fourteen <br /> hundred feet ( 1400 ' ) west and thirteen hundred feet ( 1300 ' ) east of the CR 510/ <br /> Orchid Island Drive intersection. Acquisition of cross-sections within the <br /> DESIGN LIMITS on CR 510 shall be at one hundred foot ( 100 ' ) intervals. The <br /> cross sections shall extend across the right-of-way and a minimum of twenty feet <br /> (20 ' ) outside the right-of--way. <br /> 4 . Improvements within the DESIGN LIMITS for each location will include above <br /> ground visible improvements such as existing pavement location, curbing, utilities <br /> (above ground locations only), drainage facilities, sidewalks, fences, signage and <br /> guardrails within the right-of-way. <br /> 5 . Final output will be in the form of a digital AutoCAD, release 2000i DWG file. <br /> All surveying will conform to the minimum technical standards set forth by the <br /> Florida Board of Professional Land Surveyors in Chapter 61G17-6, Florida <br /> Administrative Code, pursuant to Section 472 .027 , Florida Statutes , <br /> 6 . Research and analysis of existing right of way information (to include Abstracts or <br /> Title Searches as provided by COUNTY) field location of existing right of way <br /> monumentation and determination of the location and extent of existing right of <br /> way in the vicinity of the nine project locations . <br /> C . Geotechnical Investigation <br /> An outline of the proposed geotechnical services provided by our sub-consultant <br /> Dunkelberger Engineering & Testing, Inc . (DET) in connection with the project ' s design <br /> is shown below. <br /> ■ Cut 10 pavement cores to establish the composition of the in-place pavement <br /> materials. A 6 ' deep hand-auger boring will be extended below the pavement <br /> section at each core location to characterize the in-place embankment soils. <br /> ■ D ill 6 ' deep hand-auger borings within the proposed turn lanes to evaluate the in- <br /> place subsoils and measure groundwater levels. These borings will be drilled at a <br /> horizontal spacing of about 500 ' . A total of about 32 borings will be drilled. <br /> ■ Perform three (3) double-ring infiltrometer tests in proposed swale areas to <br /> provide infiltration (percolation) rates for stormwater design. A single test will be <br /> performed at project site no. 2 , 5 and 7 . <br /> Prepare and submit brief engineering report of our findings, conclusions and <br /> recommendations as they pertain to the planned construction. <br /> In order to assist the sub-consultant in the subsoil data acquisition, the COUNTY has <br /> agreed to provide a mobile traffic control vehicle to enable safe and expeditious sample <br /> collection. The COUNTY will provide the traffic control vehicle for no more than two <br /> days. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.