Laserfiche WebLink
The County Engineer reported that the total estimate of engineering. <br />costs, contract and guard rail on Ranch and Oslo Roads is $260,000 dor <br />four. and one-half mile of road.. On Motion by Commissioner Waddell, <br />:seconded by Commissioner. Macdonald and unanimously carried, that the <br />Engineer is authorized to request the'State Road Department to let <br />the contract On 3' mile on Ranch Road and that the 1 mile on Oslo. will <br />be built by the County out of County funds. <br />Upon Motion by Commissioner Waddell, seconded - by Commissioner <br />Haffield and unanimously carried, the County Engineer was authorized <br />to retain a certified engineer to survey the approach to the Wabasso <br />Bridge from U. S. #1, have the plans drawn up and sett to the State. <br />Road Department. <br />After considerable discussion.of the Route 60 bypass at the main <br />canal, Motion was made by'Commissioner Macdonald, seconded by Commissioner <br />McCullers and unanimously carried, that the.County Engineer and any <br />member of the Board are authorized to go to Ft. Lauderdale to discuss <br />the problem with Mr. Davidson of the State Road Department. <br />Mr. Homer C. Fletcher and Howard Heller of the National Cash <br />Register Co. appeared before .the Board with an.estimate for.an electronic <br />accounting.system, NCR #395, which Mr. Fletcher feels is necessary <br />to carry out the re -valuation program ordered by the State: Comptroller, <br />and to take care of the continuing growth of his office. Mr. Heller <br />was requested to submit his proposal for consideration of the Board <br />at their next Meeting. <br />Commissioner Waddell moved that the County Engineer be requested <br />to write Mr. Bill. Reams that the Board isof the opinion that if he <br />can get a 50' right-of-way for 10th Place, East of <br />20th Avenue, have <br />a private contractor build a road to meet county specifications, deed <br />it to the county without costs, then the County will accept maintenance <br />of it. The Motion was seconded by Commissioner McCullers and unanimously <br />carried. <br />At the request of Commissioner Waddell, the County Engineer <br />was instructed to place "Slow Children at Play" signs in Ixora Park <br />BCOx <br />9 PcE307 <br />SEP 9,-1965 <br />