Laserfiche WebLink
Based on the results of the Task 1.0 and 2.0 data collection activities, and using the <br />land survey information performed in Work Order No. 1 -RR, the CONSULTANT will <br />prepare preliminary drawings indicating the stormwater feature arrangements. <br />The CONSULTANT will prepare a Preliminary Design Report that presents the <br />preliminary engineering conclusions and recommendations pertaining to the stormwater <br />features required, permit application requirements, and address regulatory agency <br />issues that may affect the project. <br />Three copies of the Preliminary Design Report will be presented to the COUNTY for <br />review and comment. The CONSULTANT will attend one meeting with the COUNTY to <br />obtain comments on the Preliminary Design Report; and subsequently revise, finalize <br />and issue three final copies of the report incorporating the COUNTY's comments. <br />2.7 Coordination of Topographic Survey Services <br />The CONSULTANT will provide and coordinate the services of a qualified land surveyor <br />to perform any additional detailed topographic survey needed at the proposed pump <br />station location, jersey curb locations, and inflatable weir location. The land surveyor <br />will perform property search activities and also obtain title information pertaining to <br />existing easements and/or deeded right-of-ways and related pertinent right-of-way <br />maps, maintenance maps, plats, and similar documents. The land surveyor will also <br />coordinate with the COUNTY to establish locations of all (City, COUNTY, etc.) existing <br />buried utilities in the potential locations for the inflatable weir, Jersey curb, and pump <br />station. The CONSULTANT shall recommend and describe any required easements or <br />rights-of-way. <br />**END OF ATTACHMENT 1 ** <br />4 <br />CADocuments and Settings\hurlburt\Local Settings\Temporary Internet Files\OLK16A\Revised (PDR) Work Order k2 -RR - 4-24- <br />06.doc <br />