My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-159
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 1:41:13 PM
Creation date
9/30/2015 9:42:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2006
Control Number
2006-159
Agenda Item Number
7.Y.
Entity Name
Malcolm Pirnie, Inc.
Subject
Work Order No.2 -RR-Rockridge Subdivision surge protection project
Supplemental fields
SmeadsoftID
5628
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 PROJECT KICKOFF MEETING <br />Attend project kickoff meeting with COUNTY to discuss scope of work, deliverables, <br />schedule and responsibilities. The CONSULTANT will prepare minutes of meeting and <br />distribute. The CONSULTANT will perform a site visit and evaluate the existing <br />conditions for the proposed project area on the same date as the kickoff meeting. <br />2.0 PRELIMINARY ENGINEERING DESIGN REPORT <br />2.1 Review Recommendations <br />Review technical recommendations and documentation prepared by the previous <br />consultant assigned to develop and submit the COUNTY's grant application. <br />2.2 Meetings With Permitting Agencies <br />Attend and document four separate meetings with the required regulatory agencies to <br />develop a mutual understanding of the project scope of work and permit application <br />needs associated with the project. <br />2.3 Results of Investigation <br />Perform stormwater modeling investigation to confirm impact of off-site influence on <br />Rockridge subdivision and immediate area. Determine stormwater area of influence for <br />Rockridge drainage area. Use rainfall event of 2 -inches per hour for 12 hour duration <br />for the stormwater model. Review COUNTY provided 1982 report by RS&H to obtain <br />background data. Obtain and review aerial photographs for stormwater drainage area. <br />Study will determine critical velocities in canals associated with storm events. <br />2.4 Preliminary Layout <br />Prepare preliminary layout of the stormwater control features to include the inflatable <br />weir and pump station arrangements. In addition, prepare typical details for installation <br />of the necessary flap and sluice gates on the existing drainage structures (headwalls <br />and pipes), and define the proposed limits and provide design details of the required <br />"Jersey" curb arrangement within the median of Indian River Boulevard. <br />2.5 Engineer's Opinion of Probable Construction Cost <br />The CONSULTANT will prepare a preliminary Engineer's Opinion of Probable <br />Construction Cost (EOPCC) for the Project based on the preliminary arrangement of <br />stormwater features. The preliminary EOPCC will be included in the Preliminary Design <br />Report. <br />2.6 Design Recommendations <br />CADocuments <br />and <br />Settings\hurlburt\Local <br />Settings\Temporary <br />Internet <br />Files\OLK16A\Revised <br />(PDR) <br />Work <br />Order <br />k2 -RR <br />- 4-24- <br />06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.