Laserfiche WebLink
9 _ ;2 <br /> Indian River County 03 " 2S5' <br /> Task 04 - Roseland Area Stormwater Improvements <br /> WORK ORDER NO . 10 TO THE PROFESSIONAL <br /> CIVIL SERVICES MASTER AGREEMENT <br /> BETWEEN CARTER ASSOCIATES , INC . , <br /> DATED AUGUST 4 , 1998 AND <br /> INDIAN RIVER COUNTY, FLORIDA <br /> Pursuant to the Professional Services Agreement ( MASTER AGREEMENT ) dated <br /> August 4 , 19989 by and between Indian River County , a political subdivision of the State of <br /> Florida , hereinafter referred to as the COUNTY , and CARTER ASSOCIATES , INC . , 1708 <br /> 21st Street , Vero Beach , Florida , hereinafter referred to as the ENGINEER , this Work Order <br /> No . 10 is an extension of and hereby becomes a part of the MASTER AGREEMENT as <br /> follows : <br /> SECTION 1 - PROJECT LIMITS AND DESCRIPTION <br /> These services will include the revised final design , permitting , and construction plan <br /> preparation for the Roseland Area Stormwater project . The Roseland Area Stormwater <br /> Improvement Project consists of the construction of two (2 ) stormwater detention ponds <br /> ( lakes ) , conveyance pipe and swales and control structures that will provide flood control and <br /> stormwater quality treatment for a portion of Roseland lying east of the Florida East Coast <br /> ( FEC ) Railroad . The limits of the work are the east Roseland Watershed north of the City of <br /> Sebastian , east of the FEC Railroad , south of the St . Sebastian River, and west of US 19 <br /> including connecting tributaries . The plans and specifications to be provided to the COUNTY <br /> for use in constructing the work , shall be based on the COUNTY approved conceptual plan <br /> as modified during the progress meeting with SJRWMD and a landowner on June 9 , 2003 . <br /> The following work items will be installed by a combination of COUNTY forces and a <br /> Contractor selected through a bid process . <br /> 1 . Project work items include : <br /> A . Swale/Pipe Conveyance System from 78th Court to 81 st Ave . along 135th Street . <br /> This conveyance system will route water to the south lake . <br /> B . The south wet detention lake consisting of: 2 . 8 ± acres of water surface area , <br /> two (2 ) ± acres of perimeter buffer, inlet structure (s ) and an overflow structure . <br /> C . The north wet detention lake consisting of: 1 . 4 ± acres of water surface area , <br /> 1 . 2 ± acres of perimeter buffer, a wetland system to be incorporated into the <br /> lake design , an inlet structure and an overflow structure . <br /> D . The lake improvements and control structures will be located in easements or <br /> property to be acquired by the COUNTY . The north lake overflow structure <br /> shall run north on an easement that will be centered on the east property line of <br /> parcel no . 21 -30-38-00001 -0000-00004 . 1 . <br /> E . Wetland impacts are to be mitigated onsite through a combination of wetland <br /> enhancement and upland preservation . <br /> F:\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 1 of 6 <br />