My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-259
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 2:18:45 PM
Creation date
9/30/2015 6:56:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2003
Control Number
2003-259
Agenda Item Number
11.I.1
Entity Name
Carter Associates Inc.
Subject
Work Order No. 10 Services Agreement
Roseland Area Stormwater project Task 4
Area
Roseland
Archived Roll/Disk#
3207
Supplemental fields
SmeadsoftID
3438
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• l <br /> SECTION II - COUNTY OBLIGATIONS <br /> The COUNTY agrees to provide the ENGINEER with the following material , data or <br /> services as required in connection with the work to be performed under this Agreement : <br /> A . Currently available drainage studies , survey drawings , plans , calculations and <br /> other data pertinent to the project . <br /> Be Title information and title opinion relating to land necessary for the project . <br /> C . Landowner authorizations to inspect the site (s ) with jurisdictional agencies to <br /> determine existing environmental conditions . <br /> D . Landowner negotiations to acquire easements and/or right-of-way necessary <br /> for the project. <br /> E . Property appraisal information for areas of potential acquisition . <br /> F . Soils testing as required , under the direction of the ENGINEER . <br /> G . Permit Fees <br /> SECTION III - SCOPE OF SERVICES <br /> A . The ENGINEER will perform all necessary environmental investigation , <br /> engineering design , surveying , drainage design , permitting , and incidental work <br /> for the drainage and related improvements to the east Roseland Area <br /> Stormwater Improvement project . Detailed Plans and Specifications shall be <br /> prepared so that the construction can be properly bid . The ENGINEER will <br /> prepare revised plans drainage calculations and resubmit the new information <br /> to St. Johns River Water Management District ( SJRWMD ) and the US Army <br /> Corps of Engineers ( USACOE ) . <br /> Be Based on a verbal authorization to proceed , the ENGINEER has developed the <br /> final re-design based on the COUNTY approved revised plan . The ENGINEER <br /> will continue to expedite the permitting schedule in an effort to meet certain <br /> grant contract milestone dates . <br /> C . The ENGINEER will strive to complete his work on the PROJECT within the <br /> time allowed by maintaining an adequate staff of registered engineers , <br /> biologists , draftsmen , and other employees on the work at all times . <br /> D . The ENGINEER shall report the status of this project to the Director of Public <br /> Works Department upon request and hold all drawings , calculations and <br /> revised work open to the inspection of the Director or his authorized agent at <br /> any time , upon reasonable request . <br /> E . TASK 04- PROJECT DEFINITION <br /> The ENGINEER will utilize previously prepared topographic and land surveying <br /> information required of all areas of work . Location of existing structures such <br /> as mailboxes , above and below ground utilities (to the extent visible , utilities will <br /> not be dug up ) , driveways , trees , etc. shall be provided . The ENGINEER will <br /> coordinate with the COUNTY to assure access to the property. <br /> The following itemized Engineering Services are included : <br /> A . Survey Work <br /> 1 . Prepare boundary surveys for land acquisition by COUNTY <br /> - Parcel 1 — the north lake area , ( Denton property) <br /> - Parcel 2 — the mitigation area , ( Denton property) <br /> - Parcel 3 — the south lake area , ( Hanson property) <br /> 2 . Prepare Conservation Easements Exhibits ( 1 and 2 ) <br /> F:\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.