Laserfiche WebLink
- Legal Descriptions <br /> - Sketch of conservation area <br /> B . Soils and Archaeological Site Investigation Reports <br /> 1 . Schedule and coordinate soil borings at the lake site . <br /> Review soils for use as a mining operation . COUNTY to pay sub- <br /> consultant direct . <br /> 2 . Schedule and coordinate an Archaeological Survey of the project site . <br /> C . Environmental report and permitting <br /> 1 . Prepare the drawings to implement an on -site mitigation plan <br /> Prepare the mitigation plan , including plantings , monitoring , etc . <br /> Ref: G . K . Environmental , Inc . — Proposed Draft Mitigation Plan <br /> dated June 2003 <br /> 2 . Review meetings with permitting agencies , provide technical <br /> assistance in addressing requests for additional information . <br /> D . Permit Plans and Calculations <br /> 1 . S . J . R .W . M . D . Environmental Resource Permit , (40C4 ) <br /> 2 . U . S .A . C . O . E , <br /> E . Engineering final design and specifications <br /> 1 . Prepare plans and specifications for structures , piping , <br /> excavation , and swales as required for items listed in Section I . <br /> Specifications shall include summary of estimated quantities and <br /> soils reports from testing laboratory. Plans will include an overall <br /> drawing ( 1 " = 200 ft) and lake improvement drawings ( 1 " = 40 ft) . <br /> 2 . Review Shop Drawings and provide technical assistance to <br /> COUNTY staff <br /> F . Five (5 ) review meetings of design and specifications , with COUNTY <br /> staff. Three (3 ) review meeting with SJRWMD staff. Three ( 3 ) meetings <br /> with landowner. <br /> 1 . Meetings with SJRWMD to discuss mitigation plan and <br /> stormwater treatment levels <br /> 2 . Coordination with landowner, Robert Denton , regarding lake <br /> orientation <br /> 3 . 60 % drawings and specifications , ( preliminary design ) <br /> 4 . 90 % construction plans and specifications , (permit plans ) <br /> 5 . 100 % construction plans and specifications , (construction plans ) . <br /> COUNTY will supply their Standard Bid documents . <br /> G . The following items are specifically excluded from this work order and <br /> will be provided on an hourly rate basis as needed by the COUNTY . <br /> 1 . Follow through after we submit final plans and specs to the <br /> COUNTY , i . e . contract bidding , administration and/or inspection <br /> service , except as provided in item E (2 ) above . <br /> 2 . Additional engineering to resolve utility conflicts . <br /> SECTION IV - TIME FOR COMPLETION <br /> A . After receipt of written authorization to proceed , ENGINEER will proceed with <br /> the work based on the following schedule : <br /> • Submit 60 % plans and specifications - completed <br /> • COUNTY Review — completed <br /> FAPublic Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 3 of 6 <br />