EXHIBIT 1
<br /> ATTACHMENT ' B'
<br /> CONSTRUCTION COST ESTIMATE
<br /> ... . . . . . . . . ... . . .
<br /> UTILITY 1N0RK SCHEDULE « SR 50 UTILITY CONFLICTS
<br /> ITEM NO. 20 -261b" PV.0 1N M, KEPI ACEMNT FOR t6a PTF
<br /> C+INAT�CIAL PRO7['CT IQ' 28624-1-92-01
<br /> ITEM
<br /> NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL
<br /> 20-A 16" PVC WM
<br /> STA 2421+40 TO 2475+70 LF 5430 $60.00 $3251800.00
<br /> 20-8 16" MJGV
<br /> 20-C FIRE HYDRANT EA 8 $4, 500.00 $36,000 .00
<br /> STA 2421+40 (FHl) EA 1 $3,500.00 $3,500.00
<br /> STA 2442+ 10 (FH3 EA 1 $3, 500.00 $3,500.00
<br /> STA 2451 +45 (FH4) EA 1 $3500.00 $3, 500 . 00
<br /> STA 2463 +00 (FH5) EA 1 $3,500. 00 $3,500.00
<br /> STA 2472+20 ( FH6) EA 1 $3, 500.00 $3,500.00
<br /> 20-2GR2UT EXISTING 16" DIP WM LF 5430 $22 .00 $ 119,460.00
<br /> 20-E CONNECT TO EXISTING
<br /> AT 16" DIP; STA 2421 +40 LS 1 $22, 200. 00 $22, 200 . 00
<br /> AT 12" PVC WM, STA 2430+ 15, RT (82ND AVE) LS 1 $23, 195 .00 $23, 195.00
<br /> AT ?? PVC WM, STA 2430+ 55, LT (82ND AVE) LS 1 $21,890. 00 $21,890.00
<br /> AT 8" WM, STA 2445+ 30, LT (80TH AVE) LS 1 $14,865.00 $ 14,865. 00
<br /> AT 8" WM, STA 2452+20, LT (79TH AVE) LS 1 $ 14,865.00 $ 14,865.00
<br /> AT 12" WM, STA 2456+45, RT (78TH AVE) LS 1 $47,850. 00 $47,850. 00
<br /> AT 6" WM, STA 2454+80, LT ( PINE CREEK) LS 1 $ 13, 275 .00 $ 13,275.00
<br /> AT 8"?? WM, STA 2475+70, LT (INDIAN RIVER ESTATES) LS 1 $ 14, 865.00 $14,865 .00
<br /> 20-F RESTORATION LF 5430 $7.00 $38,010 .00
<br /> 20-G WATER SERVICES - RELOCATE/REPLACE AS NEEDED LS 1 $10,000.00 $ 10,000. 00
<br /> 20-H TESTING LS 1 $7500. 00 $7,500.00
<br /> TOTAL = $727,275.00
<br /> Page 4 Of 6
<br /> SR 60 UTILITY CONFLICTS
<br /> CONSTRUCTION COST ESTIMATE
<br />
|