Laserfiche WebLink
EXHIBIT 1 <br /> ATTACHMENT ' B' <br /> CONSTRUCTION COST ESTIMATE <br /> UTILITY WORK SCHEDULE SR 60 UTILITY CONFLICTS <br /> ITEM NO. 31 � 12" PYC W.M. - REPLACEMENT FOR 124* DIP <br /> FIN V'PtO]E�T ID 2286,24-1-52-01 <br /> ITEM <br /> NO, DESCRIPTION UNIT QTY UNIT PRICE TOTAL <br /> 31-A STA 2463+60 TO 2475+40 LF 1030 $45. 00 $46,350.00 <br /> 31-B DIRECTION BORE <br /> POINTE WEST LF 100 $95 .00 $9,500.00 <br /> 75TH DRIVE LF 50 $95 . 00 $4,750.00 <br /> 31 -C 12" MJGV EA 3 $2,500. 00 $7,500.00 <br /> 31-D FIRE HYDRANT <br /> STA 2469+60 (FH7) EA 1 $3, 500.00 $3, 500.00 <br /> STA 24675+40 (FH8) EA 1 $3,500.00 $3,500.00 <br /> 31-E GROUT EXISTING 12 DIP WM LF 1180 $ 18 .00 $21,240.00 <br /> 31-F CONNECT TO EXISTING <br /> AT 12" PVC, STA 2463+60 LS 1 $ 11 ,450.00 $ 11 ,450.00 <br /> AT 12" PVC, STA 2466+30 (POINTE WEST) LS 1 $ 10,500 .00 $10,500.00 <br /> AT 6" PVC, STA 2471 +25 (75TH CRT) LS 1 $8,650. 00 $8,650.00 <br /> AT 12" WM, STA 2475+40 LS 1 $ 11r450.001 $11,450.00 <br /> 31 -G RESTORATION LF 1180 $7 .00 $8,260 .00 <br /> 31-H WATER SERVICES - RELOCATE/REPLACE AS NEEDED LS 1 $5,000.00 $5,000.00 <br /> 31-I TESTING LS 1 $3,500 .00 $3,500.00 <br /> TOTAL = $ 155,150.00 <br /> Page 5 of 6 <br /> SR 60 UTILITY CONFLICTS <br /> CONSTRUCTION COST ESTIMATE <br />