Laserfiche WebLink
EXHIBIT 1 <br /> ATTACHM ENT 'B' <br /> CONSTRUCTION COST ESTIMATE <br /> UTILITY WORK SCHOULE SR 64 UTILITY CONFLICTS <br /> FTFf t N0. 92 . 31" NIM « LOOF CONTIECTION <br /> SOUTH SIpt OF SRA45rA.I2430,;tr05 TO 2438+70 = 865 FT. <br /> FII IA,9`PRO]ECT ID 22$614 I,"52-01 . <br /> ITEM <br /> NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL <br /> 32-A M .O.T. (82ND AVE) LS 1 $5,000.00 $5,000.00 <br /> 32-B 12" HDPE DIRECTIONAL BORE (82ND AVE) EA 110 $75.00 $8,250.00 <br /> 32-C 12 ' HDPE DIRECTIONAL BORE (CHEVRON DRIVEWAY) EA 60 $75 .00 $4,500. 00 <br /> 32-D 12" HDPE DIRECTIONAL BORE (PRIVATE DRIVEWAY) EA 30 $75. 00 $2,250.00 <br /> 32I 12" PVC EA 665 <br /> 32-F FHA =EA <br /> $45.00 $29,925.00 <br /> 1 $3, 500.00 $3,500 . 00 <br /> 32-G 12" MJGV 2 $2, 500. 00 $5,000.00 <br /> 32-H 12" TAP SLV/VALVE 1 $6,000.00 $6,000.00 <br /> 32-I TEMPORARY JUMPER 1 $2,000 .00 $2,000. 0032-J RESTORATION665 $7. 00 $4,655.00 <br /> TOTAL = $71,080.00 <br /> Page 6 of 6 <br /> SR 60 UTILITY CONFLICTS <br /> CONSTRUCTION COST ESTIMATE <br />