My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-010
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:31:28 AM
Creation date
9/30/2015 11:54:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/08/2008
Control Number
2008-010
Agenda Item Number
11.J.2
Entity Name
Schulke ,Bittle & Stoddard
Masteller & Moler
Subject
Work Order No.5 Services Agreement
Work Order No. 11 Services Agreement
Supplemental fields
SmeadsoftID
6834
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File #0773 <br /> December 12, 2007 <br /> NON-EXCLUSSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> ATTACHMENT <br /> • Prosect Description <br /> The State of Florida Department of Transportation glans to construct a four-lane to six-lane <br /> roadway expansion project along SR 60 between 66 Avenue and 82"" Avenue in Indian River <br /> County. Said project requires that Indian River County Utilities relocate certain existing potable <br /> water and wastewater improvements in advance of the FDOT project in order to eliminate <br /> conflicts with the State roadway design. The existing 16" potable water main along the north <br /> side of SR 60 will be replaced with a new potable water system . The existing 12" potable water <br /> main on the south side of SR 60 west of 70 Avenue will be replaced with a new potable water <br /> system . Adjustments will be made to the existing wastewater force main system . <br /> The estimated Construction Cost for the Utility Improvements Scope of Services for Work Order <br /> No . 11 is $ 1 ,661 ,620.00. <br /> In order to expedite the Project Scope and to not duplicate acquisition of route survey <br /> information previously prepared by the FDOT, County has provided Consultant with copies of <br /> the FDOT's Roadway Improvements Plans, both hard copy and AutoCadd format. These <br /> documents include route survey information and proposed roadway construction details. It is <br /> understood that the information provided reflects the final design of the FDOT roadway project <br /> improvements. Furthermore, it is understood that the County has obtained authorization from <br /> the FDOT to allow said information to be used by Masteller & Moler, Inc. in the performance of <br /> the Scope of Services described herein . <br /> In order that Indian River County may construct the required utility adjustments as described <br /> above , Masteller & Moler, Inc. proposes to perform the following scope of services; <br /> • Scope of Services <br /> Task A — Design & Permittino: Potable Water & Sewer Force Main "Utility" Adjustments <br /> The County Utilities Department will locate, expose at the ground surface, and place a stake by <br /> all existing potable water valves, wastewater valves, and fire hydrants between Stations <br /> 2470+00 and 2534+00 along the SR 60 project limits. Once the County has performed the <br /> above described work, we shall locate each valve and fire hydrant with GPS equipment to <br /> identify State Plane Coordinates for each valve/hydrant located . Valves and hydrants located <br /> will be shown on the base plans to be provided by the FDOT for incorporation into the proposed <br /> Utility Adjustment Plans to be prepared under this Scope of Service. <br />
The URL can be used to link to this page
Your browser does not support the video tag.