My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-010
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:31:28 AM
Creation date
9/30/2015 11:54:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/08/2008
Control Number
2008-010
Agenda Item Number
11.J.2
Entity Name
Schulke ,Bittle & Stoddard
Masteller & Moler
Subject
Work Order No.5 Services Agreement
Work Order No. 11 Services Agreement
Supplemental fields
SmeadsoftID
6834
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment #1 <br /> 12/12/2007 <br /> Page 2 <br /> Design & Permitting: Masteller & Moler, Inc. will utilize the route survey and base plans <br /> prepared by the FDOT's roadway consultant. We shall use these base plans for design and <br /> preparation of construction plans for a new 16" PVC potable water main and the wastewater <br /> force main adjustments in the existing system between Stations 2470+00 and 2534+00 along <br /> the SR 60 project limits. Plans and specifications shall include requirements for connection of <br /> the new utilities to existing systems to remain . Plans and specifications will also include the <br /> requirements for abandonment of portions of the system replaced by new mains. The designs <br /> shall be supported by maintenance of traffic standards consistent with FDOT Specifications . <br /> We shall secure permits for the proposed work from the following agencies: <br /> • Florida Department of Transportation — Utilities Permit <br /> • Florida Department of Environmental Protection (Potable Water General Permit) <br /> • Indian River County Utilities — Utilities Permit <br /> Permit application fees are not included in this proposal. <br /> Using IRCUD standard bid documents, we shall prepare Contract Plans and Bid Documents to <br /> allow the Indian River County Purchasing Department to advertise and bid the proposed Utility <br /> Adjustment work. <br /> Task B — Construction Services <br /> Masteller & Moler, Inc. will provide assistance during bidding and periodic observation of the <br /> potable water and wastewater improvements construction project on an as-needed basis to <br /> confirm that construction is in reasonable compliance with the Construction Plans and Permits . <br /> We will also attend meetings, review shop drawings and monthly pay estimates from the <br /> Contractor. <br /> The Contractor will be required to provide as-builts upon completion of the construction <br /> improvements. We shall review the as-builts to confirm the format is in compliance with County <br /> Utility Standards . <br />
The URL can be used to link to this page
Your browser does not support the video tag.