My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-296
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2016 2:21:52 PM
Creation date
10/1/2015 3:58:11 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/10/2009
Control Number
2009-296
Agenda Item Number
12.J.1
Entity Name
Schulke,Bittle & Stoddard
Subject
Work Order 9 Water Main Extension master plan
Area
53rd. St. from Lateral H Canal to I.R.Blvd. Old Dixie
Project Number
0107
Supplemental fields
SmeadsoftID
10868
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOSEPH W. FrLE , PE .E , P . E <br /> ITTLE , <br /> JODAH B BP . SCHULKEr BITTLE & STODDARDf L . L . C . <br /> . <br /> WILLIAM P . STODDARD . Ph . D . , P E . <br /> CIVIL & STRUCTURAL ENGINEERING LAND PLANNING • ENVIRONMENTARECOV E R <br /> Letter of Transmittal SEP 1 5 2009 <br /> UTILITIES <br /> Larry Brown Joseph W . Schulke, P . E. <br /> COMPANY : 1) ATI <br /> IRCDUS September 14, 2009 <br /> ADDRESS : <br /> Hand Delivery <br /> PROJECT: IOB NUN1131 ? R: <br /> IRCDUS 53`, Street 09 -031 <br /> NO . OF TYPE 01" <br /> COPIES PRINTS 1 ) 13SCIt1P17ION <br /> Attached is my revised proposal , WO no . 9 — revision no . 4, which includes "potholing" <br /> existing utilities and surveying the location ; verbage regarding reviewing and evaluating the <br /> 1 IRC PW road and drainage plans and making recommended changes that will result in <br /> reducing the number of utility conflicts ; change the cost estimate to reduce the contingency <br /> from 15 % to 10 % and reduce the unit price for the water main bridge crossing. The total <br /> construction cost is now estimated at $ 689k in lieu of $ 744k . . <br /> Copy of my quote from SITEWERKS to locate / pothole the utilities at all <br /> conflicts . This is a pass thru cost — I have not marked up — it is reflected in my <br /> WO for the same amount as they are charging me . We estimate that there will <br /> 1 be approx . 19 potholed excavations . <br /> REMARKS : <br /> SIGNATURE: <br /> c01> I l:s <br /> Joe Sc ulke <br /> 1717 INDIAN RIVER BLVD . , SUITE 201 VERO BEACH , FLORIDA 32960 <br /> TEL 772 / 770- 9622 FAX 772 / 770- 9496 EMAIIL info@sbsengineers . com <br />
The URL can be used to link to this page
Your browser does not support the video tag.