8 . 9 Safety Plan (Section 41) <br /> 8 . 10 Comes of all required licenses, permits and certifications. (Section 10) <br /> 8. 11 U.S. Coast Guard Certifications. The CONTRACTOR shall obtain any and all U. S. <br /> Coast Guard dredge certifications and/or approvals. Copies of all required U.S . Coast <br /> Guard certification or approval must be provided at the Pre-Construction Meeting. <br /> (Section 10). <br /> 8. 12 Other Items as maybe specified elsewhere in this document. <br /> 9. WORK PROGRESS SCHEDULE <br /> The Work Progress Schedule shall be in the form of a bar graph showing the time allotted for each of <br /> the various activities of work. The Schedule shall show the various activities of work in sufficient <br /> detail to demonstrate that the CONTRACTOR has a reasonable and workable plan to complete the <br /> Project within the Contract Period. The Schedule shall show the order and interdependence of <br /> activities and the sequence in which the work is to be accomplished as planned by the <br /> CONTRACTOR. All activities shall be described so that the work is readily identifiable and the <br /> progress on each activity can be readily measured, Each activity shall show a beginning work date, <br /> and duration. Activities shall include procurement time for materials, plants and equipment, and <br /> review time of shop drawings where they are appropriate and essential to the timely completion of <br /> the Project. The list of activities shall include milestones when required by the Plans or the Contract <br /> Documents. Sufficient liaison shall be conducted and information provided to indicate coordination <br /> of activities with utility owners having facilities within the Project limits. <br /> The Schedule shall be reviewed by the COUNTY at the Pre-Construction Meeting and shall become <br /> part of the Contract Documents. If the Schedule submitted is determined to be inadequate by the <br /> COUNTY, it shall be returned to the CONTRACTOR for correction. The CONTRACTOR shall <br /> have fifteen ( 15) calendar days from the date of transmittal to submit a corrected schedule. When <br /> approved, this original schedule shall constitute the baseline against which progress is measured. <br /> The CONTRACTOR shall submit an updated Work Progress Schedule only when requested by the <br /> COUNTY. If revisions are required to the Work Progress Schedule, the CONTRACTOR shall <br /> furnish revised charts and analysis within 21 calendar days after being notified by the COUNTY . <br /> Failure to finalize either the initial or a revised Schedule in the time specified shall result in <br /> withholding of all Contract Payments until the Schedule is approved. <br /> 10. PERMITS, LICENSES, CERTIFICATIONS, APPROVALS, AND EASEMENTS <br /> The CONTRACTOR shall comply with all the requirements of the permits, easements, and <br /> conditions of this contract including the Florida Department of Environmental Protection (FDEP) <br /> Permit 0166929-001 -JC Variance 0166929-007-EM and Permit 0215960-001 -JC, the U. S. Army <br /> Corps of Engineers (USACE) Permit 2000- 1872 and 2003 -6106, the National Marine Fisheries <br /> Service Regional Biological Opinion on Hopper Dredging including the Sea Turtle and Smal ( tooth <br /> Sawfish Construction Conditions Fish and Wildlife Service Biological Opinion , and the State <br /> Sovereign Submerged Lands Easement (Appendices B, C, D , and E respectively). The <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5. 2007 TS-5 <br />