My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-361
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:59:12 PM
Creation date
9/30/2015 11:23:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
10/23/2007
Control Number
2007-361
Agenda Item Number
7.N.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration Project for Sectors 1 & 2
Second Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be collected at a maximum distance of 150 meters (492 <br /> feet) down-current from the dredge, in the densest portion of <br /> any visible turbidity plume, and the samples shall be collected <br /> at the surface and mid-depth. <br /> 13 . 1 . 1 . 2 .2 Sebastian Inlet Sand TiapBorrow Site. The CONTRACTOR <br /> shall be responsible for the third partv to conduct turbidity <br /> monitoring at the borrow site every six (6 ) hours during <br /> dredging operation with the First sample taken within 10 <br /> minutes following commencement of each dred m evc1e. <br /> The CO'NTRACTOR' S third part shall collect additional <br /> samples at the request of the ENGINEER or the COUNTY, <br /> The CONTRAC'TOR ' S third party shall collect Back round <br /> and Compliance samples for the offshore bonow site The <br /> Background turbidity sample shall be collected at a minimum <br /> distance of 300 meters (984 feet) un-current from the dredge <br /> and clearlyoutside ofanvpimect-induced turbid plume The <br /> borrow site Background sample shall bQ collected at mid- <br /> deptli . <br /> The Compliance Site Tvpe I turbidity samples -hall be <br /> collected at a maximum distance of 150 meters ("492 feet) <br /> down-current from the dredge in the densest portion of any <br /> visible turbidity plume and the sample- shall be collected at <br /> the surface and mid-depth If the difference between the <br /> Compliance Site Type 1 and Background samnles is «neater <br /> than 2 NTUs, construction activities shall ceaseimmediateh, <br /> and not resume until measur€s have been taken. and the <br /> difference between the Complmnec Site Type I and <br /> Background samples is 0 NTC or less- If the difference <br /> between the Compliance Site Type 1 and Backgmunt' <br /> samples is greater than 0 NTUs and less than or equal to <br /> NTi1s , the CONTRACTOR ' S third panty shall repeat the <br /> sampling (both the Background and Coin pliance Site Tx pe 1) <br /> 30 minutes later If the difference between the Can Bance <br /> Site Type I and Backm-ound samples remains to be greater <br /> than 0 NTUs and less than or equal to a NTUs. the <br /> CONTRAC'TOR ' S thirdpartN_,hall repeat the carrujing evcry <br /> 30 minutes. If the difference between the Compliance Site <br /> Tvpe I and Background samples becomes 0 or less the next <br /> sampling effort shall occur 6 hours later if atter a total of <br /> four consecutive samples- the difference between the <br /> Compliance Site Tvpe I and Background samples remains to <br /> be greater than 0 NTUs and less than or equal to I NTIIs <br /> construction activities shall cease immediately and not <br /> resume until measures have been taken and the difference <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5, 200; TS-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.