Laserfiche WebLink
between the Compliunce Site Tvpe ] • nd Backatound <br /> samples is 0 NTLI or less <br /> Tn addition to Compliance Site TYoe 1 samples Cmnphince <br /> Site Tvpe two samples shall be collected at the edge of the <br /> seaerass bed within the densest portion of the plume If no <br /> Plume is visible, then the location -hall be at the nearest edee <br /> of the sea_rass bed in the direction of current Flow . The <br /> samples shall be collected at mid -depth and the surface <br /> 13 . 1 . 1 .2,E Beach Nourishment Site Project Site). The CONTRACTOR - ,, Deleted, a <br /> shall be responsible for the third party to conduct turbidity <br /> monitoring every six (6) hours during pumping operations, <br /> upland sand is placed/graded on the beach below the MWH <br /> line, or any other in-water work, with the first sample taken <br /> within 1 hour following commencement of said activity, and <br /> additionally whenever excessive turbidity plumes or pipeline <br /> leaks are observed or reported. The CONTRACTOR shall <br /> collect Background and Compliance samples for the beach <br /> nourishment site. The Background turbidity sample shall be <br /> collected at a point approximately 150 meters (492 feet) <br /> offshore, ,500 meters (1 ,640 feet) up current from the _ —` Deleted: and <br /> discharge point foi Sector 7 and l 000 meters (3 ,294 tc et) up- ---J <br /> current from the discharge point for Sectors 1 R '>, where <br /> upland sand is placed/graded below the MHW line, or any <br /> other in-water work. The Background sample shall be <br /> collected clearly outside of any project-induced turbidity <br /> plume, and shall be collected at mid-depth. The Compliance <br /> turbidity sample shall be collected at a point no more than <br /> 120 meters (394 feet) offshore, and no more than 1 ,000 <br /> meters (3 ,281 feet) down-current from the discharge point, <br /> where upland sand is placed/graded below the MHW line, or <br /> any other in-water work . The Compliance sample shall be <br /> collected within the densest portion of any visible turbidity <br /> plume, and shall be collected from the surface and at mid- <br /> depth. <br /> 13 . 1 . 1 .3 Turbidity Reportjng. The CONTRACTOR shall be responsible for the <br /> third Party to complete the Turbidity Monitoring Report that is provided <br /> in Appendix F of the Contract Documents and the CONTRACTOR shall <br /> submit the appropriate Turbidity Monitoring Reports to the COUNTY <br /> daily with the Contractor's Daily Quality Control Report as described in <br /> Section 12 ofthese Technical Specifications. The turbidity data shall be <br /> reported in Nephelometric Turbidity Units (NTUs). The <br /> CONTRACTOR shall provide the following : a statement describing the <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rey October 5. 2007 TS- 10 <br />