My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-361
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:59:12 PM
Creation date
9/30/2015 11:23:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
10/23/2007
Control Number
2007-361
Agenda Item Number
7.N.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration Project for Sectors 1 & 2
Second Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2.2 . 7 Shorebird Protection. Moil itoring shorebird nesting activity shall be the <br /> responsibilitv of [ he COUNTY. IftheproiectproceedslalerthanApril 1 , <br /> a daily marine turtle nestina survey will be required to identify and <br /> possibly relocate anynestinthe project area . Construction activityrniN, <br /> not commence until the completion of the shorebird survev each dati <br /> Nests may be present on the beach outside of the work area at the time of <br /> construction . The CONTRACTOR shall not allow equipment on the <br /> beach outside of the designated work area If exclusion zones and -or <br /> travel and pipeline corridors are established due to nesting or fora <br /> shorebirds. the CONTRACTOR shall abideby the established zone ' and <br /> project permits <br /> 13 .2 .2,$ _ Reef Protection and Monitoring. With the exception of nearshore — Deleted: e <br /> hardbottom within the fill template, the CONTRACTOR shall avoid <br /> impact to all hardbottom and reef areas during all phases of the project as <br /> outlined in the Technical Specifications. The CONTRACTOR shall be <br /> liable for any non-compliance with the conditions of the permits, <br /> easements and terms of this contract attributable to their personnel or <br /> subcontractors. <br /> 13 .2.3 Procedures to be implemented to provide the required environmental protection and <br /> to comply with the applicable permits, laws, and regulations. The CONTRACTOR <br /> shall provide written assurance that immediate corrective action will be taken to <br /> correct pollution of the environment due to accident, natural causes, or failure to <br /> follow the procedures set out in accordance with the Environmental Protection Plan , <br /> 13 .2 .4 Drawings showing locations of any proposed temporary excavations or <br /> embankments for haul roads, material storage areas, structures, sanitary facilities, and <br /> stockpiles of excess or spoil materials. <br /> 13 .2 .5 Work Area Plan showing the proposed activity in each portion of the area and <br /> identifying the areas of limited use or nonuse. The Work Area plan should include <br /> measures for marking the limits of use areas. <br /> 13 .2.6 A statement identifying person(s) who will be responsible for implementation of the <br /> Environmental Protection Plan. The CONTRACTOR personnel responsible shall <br /> report directly to the CONTRACTOR' S top management and shall have the <br /> authority to act for the CONTRACTOR in all environmental protection matters. <br /> 13 .2 .7 A statement acknowledging that the CONTRACTOR is responsible for <br /> environmental protection, including all of the CONTRACTOR' s personnel and <br /> subcontractors. <br /> 13 .2.8 The Environmental Protection Plan will be dated and endorsed by the individual in <br /> responsible charge of the construction . <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS_ Rev October 5. 2007 TS- 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.