My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-361
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:59:12 PM
Creation date
9/30/2015 11:23:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
10/23/2007
Control Number
2007-361
Agenda Item Number
7.N.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration Project for Sectors 1 & 2
Second Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The construction sign posts shall be 6 inch x 6 inch x 12 feet CCA pressure treated southern pine <br /> placed 4 feet into the ground with sand fill compacted around each post. For each sign, theplywood <br /> panels shall be bolted to each post using 3 galvanized steel bolts with a washer on each side. The <br /> bolts shall be 3/8 inch x 8 inches. The signs shall be erected at the Sebastian Inlet State Park Day- <br /> Use Area for Sectors 1 & 2and at a location to be determined for Sector 7. The CONTRACTOR <br /> shall verify location with the COUNTY prior to construction. The CONTRACTOR shall consult <br /> with the COUNTY to determine the location for signage prior to construction of Sector 7. The <br /> CONTRACTOR shall remove the signs when construction is complete. <br /> 15 . ELECTRICITY <br /> All electric current required by the CONTRACTOR shall be furnished at the CONTRACTOR's <br /> expense. All temporary connections for electricity shall comply with NEC 1990. In the event <br /> electricity is made available by the COUNTY, the CONTRACTOR shall, at the CONTRACTOR's <br /> expense, install a meter to determine the amount of current used and such electricity shall be paid or <br /> charged to the CONTRACTOR at prevailing rates or at reasonable rates as determined by the <br /> COUNTY. All temporary lines shall be furnished, installed, connected, and maintained by the <br /> CONTRACTOR in a manner satisfactory to the COUNTY and shall be removed by the <br /> CONTRACTOR in like manner, at the CONTRACTOR's expense, prior to completion of the <br /> construction. In accordance with NEC Article 305-6, the CONTRACTOR shall provide ground fault <br /> circuit interruption (GFCI) on all 120 volt 15 and 20 ampere, single-phase receptacles used for <br /> construction power. Ground fault circuit interrupters are not an acceptable substitute for grounding. <br /> 16 . EXCLUSION OF THE PUBLIC <br /> The CONTRACTOR shall exclude the public from the immediate work area at all times during <br /> construction. The CONTRACTOR shalt post a minimum of one dedicated employee for the sole <br /> purpose of full-time, 24-hour per day security at the discharge location. The CONTRACTOR shall <br /> be required to erect, maintain, and move as necessary, restrictive barriers around the discharge of the <br /> hydraulic pipeline. The barriers shall be constructed so as to prevent the public from approaching <br /> the discharge from any direction closer than 100 feet. The CONTRACTOR shall post signs at each <br /> barrier in a conspicuous manner stating, "DANGER — HIGH PRESSURE DISCHARGE — KEEP <br /> OUT" <br /> If the CONTRACTOR is not able to keep and maintain the public at a safe distance form <br /> construction activity, the CONTRACTOR is to notify the COUNTY or ENGINEER and request <br /> assistance in controlling public access to the active construction site. <br /> 17 . TRAFFIC CONTROL <br /> The CONTRACTOR shall provide and maintain barricades, security guards, warning signals and <br /> flagmen as required by FDOT Specifications Section 102, by other state or federal regulations or as <br /> directed to ensure public safety . All work under this section shall be included in the Traffic Control <br /> bid item . Trenching and earthwork shall be conducted in a manner to cause the least interruption to <br /> traffic. Where traffic must cross open trenches, the CONTRACTOR shall provide suitable bridges . <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5 , 2007 TS-20 <br />