Laserfiche WebLink
The CONTRACTOR shall notify the COUNTY in writing one (1 ) day in advance of the <br /> mobilization of each piece of floating equipment. Mobilization into the work area shall be <br /> through the corridor limits shown in the Plans. No anchors shall be deployed outside the <br /> work area. All floating equipment shall be self-propelled or directly pushed when <br /> landward of the —200 foot NGVD contour line. The CONTRACTOR shall monitor the <br /> location of each piece of floating equipment mobilized through the use of horizontal <br /> positioning equipment which has an accuracy of at least + 3 feet. Position data shall be <br /> recorded every thirty (301 sec � A copy of the.data and plots shall be provided to the - i Deleted: am; (1) minute <br /> COUNTY daily in the Contractor' s Daily Quality Control Report (Appendix G). If any <br /> floating equipment (barges, pipe strings, dredges, etc), other than self-propelled vessels <br /> (tugs, survey boats, crew boats, etc), leaves the project area and is remobilized into the <br /> borrow area, these mobilization procedures shall be repeated. <br /> 27 .2 Demobilization. Demobilization shall be according to the same requirements for <br /> mobilization specified in Section 27 . 1 . <br /> 28 . EQUIPMENT POSITIONING AND CUT DEPTH MONITORING <br /> Accuracy and Precision. The CONTRACTOR shall have equipment on the dredge that <br /> continuously measures the vertical and horizontal location of the cutterhead, drag <br /> arms, dustpan, or clamshell and is interfaced with the cut depth positioning <br /> equipment. The specifications for this equipment, calibration information, and limits <br /> of accuracy are to be provided to the COUNTY. The COUNTY will approve or <br /> reject use of specific equipment based on accuracy. Horizontal accuracy for dredge <br /> positioning shall be within +3 feet. Vertical accuracy for dredge depth positioning <br /> shall be within +1 . 0 foot. This equipment shall provide a permanent record of the <br /> equipment's position referenced to State Plane Coordinates (NAD 83 , Florida East <br /> Zone) and NGVD 29 datum. <br /> During dredging, reports on the position (x,y) of and bottom elevation (z) of the cutterhead, <br /> drag arms, dustpan or clamshell shall be provided. This position shall give both horizontal <br /> (in State Plane Coordinates, NAD 83 , Florida East Zone datum) and vertical (depth <br /> corrected for tide in feet referenced to NGVD 29 datum) position. The dredge depth <br /> (cutterhead, dragheads, or dustpan) shall be corrected for tidal fluctuations by a method <br /> pre-approved and acceptable to the ENGINEER. The tide measurements must be acquired <br /> and applied to the vertical control equipment on a real-time or hourly basis. At a minimum <br /> the report shall give the location at 30 second intervals for cutterhead, hopper, clamshell or <br /> dustpan dredges. During unloading of hopper dredges and scows, data shall be collected at <br /> the time of the beginning of the unloading and immediately prior to departure to the borrow <br /> area. The CONTRACTOR shall also submit an ASCII file and a plot of the horizontal <br /> positions of the dredge for each day. The plot shall show the borrow area and dredge area <br /> limits, the dredge position, a north arrow and the Florida State Plane grid. The plot shall <br /> contain numbered position fixes that correspond to the positions discussed above. The <br /> previous day's data shall be provided to the COUNTY daily as part of the Contractor' s <br /> Daily Quality Control Report (Appendix G). The location on the dredge of the positioning <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5. 2007 TS-26 <br />