Laserfiche WebLink
with the judgment of the CONTRACTOR regarding the need to level escarpments. <br /> Leveling will be conducted in compliance with sea turtle nesting permit conditions. <br /> 31 . 17Tilline . The CONTRACTOR shall , immediately following the completion of fill <br /> placement for the project, mechanically till the beach to a depth of 36 inches. Any <br /> marked sea turtle nests in the project area will be avoided during the tilling process. <br /> 31 . 18 Misplaced Material . The CONTRACTOR shall minimize loss and/or misplacement <br /> of fill material. If, during the progress of the work, the CONTRACTOR should lose, <br /> dump, throw overboard, sink, or misplace any material, plant, machinery, or <br /> appliance which in the opinion of the COUNTY should be removed, the <br /> CONTRACTOR shall recover and remove the material(s) immediately . The <br /> CONTRACTOR shall provide immediate notice to the COUNTY including a <br /> description of and DGPS coordinates for such obstructions. Should the COUNTY <br /> observe such obstruction, the COUNTY shall record the position or mark the <br /> obstruction and notify the CONTRACTOR. Removal of the obstruction and all <br /> associated costs shall be the responsibility of the CONTRACTOR. The COUNTY <br /> shall monitor any removal operations. Should the CONTRACTOR refuse, neglect, or <br /> delay compliance with the above requirements, such obstructions may be removed by <br /> the COUNTY, and the cost of such removal may be deducted from any money due or <br /> to become due to the CONTRACTOR or may be recovered under the <br /> CONTRACTOR's bond. The liability of the CONTRACTOR for the removal of a <br /> vessel wrecked or sunk without fault or negligence shall be limited to that provided in <br /> Sections 15 , 19, and 20 of the Rivers and Harbor Act of March 3, 1899 (33 -U .S .C. <br /> 410 et. seq .). <br /> 32. SITE RESTORATION <br /> Site restoration shall include the removal of the CONTRACTOR's plant(s) and all equipment or <br /> materials either for disposal or reuse. Plant(s) and/or equipment or materials for disposal shall be <br /> disposed of in an appropriate and legal manner at the expense of the CONTRACTOR. Unless <br /> otherwise approved in writing by the COUNTY, the CONTRACTOR shall not be permitted to <br /> abandon pipelines, pipeline supports, pontoons, or other equipment in the pipeline access areas, <br /> water areas, or other areas adjacent to the work site. Any stakes or other markers placed by the <br /> CONTRACTOR must be removed as a part of the final site restoration. Grade stakes placed during <br /> the fill operation, and pieces of stakes, shall be completely removed and shall not be buried in the <br /> fill . All costs associated with site restoration shall be included in the Site Restoration bid item. <br /> 33 . BATHYMETRIC SURVEY OF THE BORROW AREA Formatted: Not Highlight <br /> The CONTRACTOR shall provide a bathymetric survey of the designated Borrow Areaprior to and <br /> immediately after construction. All surveys shall be in accordance with professional standards and <br /> practices, and all survey documents shall be signed and sealed by a surveyor registered in the State <br /> of Florida. Said surveyor should carry Professional Liability Insurance. The land surveyor <br /> employed for this project must comply with the minimum Technical Standards for land surveyors in <br /> the State of Florida pursuant to Florida Statute 472.027 adopted rule 121 HH-6. The CONTRACTOR <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5, 2007 TS-32 <br />