My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-361
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:59:12 PM
Creation date
9/30/2015 11:23:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
10/23/2007
Control Number
2007-361
Agenda Item Number
7.N.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration Project for Sectors 1 & 2
Second Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 .2 Prot3ess Payment. Monthly progress payments shall be based solely on 100% <br /> completed and surveyed Acceptance Sections that have been Accepted by the <br /> COUNTY. Progress payments shall be subject to retainage as per Article 14 .2 of the <br /> General Conditions of the Contract and per Article 4 of the Agreement. All field <br /> notes, computations and the records used by the CONTRACTOR to compute fill <br /> quantities shall be furnished to the COUNTY with the Application for Payment. Pay <br /> profile surveys will be conducted by the CONTRACTOR. Surveys will be conducted <br /> in accordance with Section 38 . The CONTRACTOR will be eligible for progress <br /> payments when four (4) consecutive Acceptance Sections have been completed. <br /> 39 .3 Payment Calculations. Payment calculations shall be made using the average end- <br /> area method based on net quantities of beach fill placed and graded according to the <br /> requirements of Sections 30 and 31 and the design template requirements specified in <br /> the Plans. Calculations of fill quantity made by the CONTRACTOR shall be <br /> reviewed by the ENGINEER and/or the COUNTY. Gross fill quantities shall be <br /> based on the comparison of the pre-construction survey profiles to the acceptance <br /> profiles. Any fill above the 0.5-foot overfill tolerance shall be deducted from the <br /> gross fill quantities and payment shall be based on the net fill quantity . If the materi al <br /> does not readily assume the designed offshore slope, the contractor will be allowed to <br /> construct compensating slopes with the understanding that the pay volume of the <br /> designed template may not be exceeded. <br /> 39 .4 Maximum Pay Volume. The COUNTY shall revise the design template shown on <br /> the Contract Drawings (based on October 2004 survey data) to reflect the <br /> CONTRACTOR ' S pre-construction survey. The COUNTY shall provide a table of <br /> maximum pay volume to the CONTRACTOR within seven (7) days of receipt of <br /> survey data. The table shall be enumerated according to the pay profile (R-9 to 9.5, <br /> R- 10 to 10.6, etc.) . A tolerance of +0.5 feet (Section 31 .5) is provided to <br /> accommodate inaccuracies and variability in the construction and measurement ofthe <br /> design grade. The maximum pay volume shall be calculated using the average-end <br /> area method. However, the CONTRACTOR shall not intentionally fill above the <br /> design template. <br /> 39 .5 Pay Profiles. All pay profiles are contained in the plans and specifications for the <br /> project. UNDER NO CIRCUMSTANCES WILL PROFILES, OTHER THAN <br /> THOSE PROVIDED IN THE PLANS AND SPECIFICATIONS, BE CONSIDERED <br /> FOR PAYMENT PURPOSES. The pay profile lines to be used for payment wilt be <br /> the 26 profile monument locations between R-4 and T- 17, inclusive for Sectors 1 & 2 <br /> and R-97 through R-108 for Sector 7. The ENGINEER and the COUNTY have <br /> designated the pay profiles, as shown on the Plans, and will not review or consider <br /> any other profiles than those shown on the Plans. The CONTRACTOR accepts and <br /> acknowledges that no discussion, arbitration, negotiation, or any other legal <br /> procedures will be employed by the CONTRACTOR or any of his agents in an <br /> attempt to force consideration of any other profiles for payment purposes other than <br /> those identified in the plans and specifications. The ENGINEER shall have final <br /> decision regarding any and all issues related to pay profiles, pay volumes and any <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5 , 2007 TS-38 <br />