Specifications), equipment calibrations, verification of the position of all dredging <br /> equipment, duplicate sample analyses (turbidity monitoring) and any other methods <br /> the CONTRACTOR proposed to assure the quality of their work. These methods <br /> shall also be used for any and all work that will be performed by subcontractor(s). <br /> 40.4 OC Renorting Requirements shall also be specified in the QA Plan . The <br /> CONTRACTOR shall be required to prepare and submit to the COUNTY the <br /> Contractor' s Daily Quality Control Report (Appendix G). The Contractor' s Daily <br /> Quality Control Report shall include as attachments the : Dredge Position Printouts. <br /> Construction Stake Log, Turbidity Monitoring Reports and Chart, and Sea Turtle <br /> Observer' s Report. The Contractor's Daily Quality Control Report with attachments <br /> is due to the COUNTY on a daily basis by noon on the following day. Reports shall <br /> be provided from the first day of mobilization to the last day of work including site <br /> restoration . The Daily Quality Control Report shall be filled out every day, regardless <br /> of whether work was accomplished. Failure to provide Daily Quality Control Reports <br /> to the COUNTY shall result in delay in payments to the CONTRACTOR until the <br /> Daily Quality Control Reports are received and are acceptable to the COUNTY . <br /> 40.5 OA Inspections. All compliance inspections conducted by the CONTRACTOR, the <br /> COUNTY, or the FDEP shall be individually recorded on the Contractor' s Daily <br /> Quality Control Report, including but not limited to the specific items required in <br /> Section 13 of these Technical and Environmental Specifications. The inspector shall <br /> also record the recommended corrective action to be taken and shall conduct a follow- <br /> up inspection within 24 hours to ensure compliance with the corrective action . The <br /> Contractor' s Daily Quality Control Report with recorded inspections are to be <br /> furnished to the COUNTY daily. <br /> 40.6 OA/OC Deficiencies. The CONTRACTOR is responsible for implementing any <br /> corrective actions recommended by the Quality Assurance Officer, the COUNTY, or <br /> the FDEP. Reported deficiencies shall require follow-up inspection within 24 hours <br /> by the CONTRACTOR' S Quality Assurance Officer, the COUNTY, and/or the <br /> FDEP. Recurring deficiencies in an item or items may indicate inadequacies in the <br /> Quality Assurance Plan and the CONTRACTOR may be required to revise the QA <br /> Plan as directed by the COUNTY and advise appropriate personnel of any <br /> modifications required. <br /> 41 . SAFETY REQUIREMENTS <br /> The CONTRACTOR shall specify all safety inspection procedures and designate personnel <br /> responsible for supervising accident prevention activities and insuring compliance with safety <br /> measures. At the time of the Pre-Construction Meeting, the CONTRACTOR shall submit to the <br /> COUNTY a Safety Plan . The Safety Plan shall include but not be limited to the following: <br /> 41 . 1 Letter of Appointment designating a Safety Officer(s), describing responsibilities, <br /> providing qualifications and delineating the line of authority and organizational <br /> reporting requirements of the Safety Officer. <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5 . 2007 TS-40 <br />