Laserfiche WebLink
DEP Permit No . : 0166929-010-EM <br /> parameters listed above, then the fill material shall not exceed the naturally occurring <br /> level for that parameter. " <br /> The provisions of this rule shall be adhered to by the Contractor and enforced by the <br /> engineer and the County throughout the construction process . <br /> In addition to the provisions delineated within Rule 62B-41 .007(2)0) F .A.C . the placed <br /> material will conform to the physical parameters specified within Table 1 . <br /> Table 1 <br /> Placed Material Project Characteristics <br /> Minimum Requirements <br /> Characteristic Range <br /> Mean Grain Size 0.25 to 0 .65 mm <br /> Carbonate Content Not to Exceed 80% <br /> Moist Color (Munsell) l OYR/6 or lighter <br /> Sediment Excavation <br /> In order to achieve the sediment quality requirements as outlined herein, a specific <br /> borrow area cut geometry for both the offshore and Sebastian Inlet Sand Trap sites was <br /> developed based on extensive field evaluations and detailed geotechnical analysis. The <br /> results of these analyses are identified in the Contract Documents (Plans and <br /> Specifications) . The borrow area geometry as identified in the figures shows the limits of <br /> the borrow area. Additionally, a magnetometer survey has identified anomalies within <br /> the borrow area and a dredge exclusion area is represented in Figures 1 and 3 . The <br /> dredge shall not operate within the identified Dredge Exclusion Area. The elevations <br /> (depths) of the cuts within the Primary and Secondary Borrow Areas are -31 feet NGVD <br /> and -30 feet NGVD , respectively and as identified in Figures 2 and 4; this depth includes <br /> a -2 foot overcut allowance. <br /> The Sebastian Inlet Sand Trap and its cut geometries are shown in Figures 5 and 6 . The <br /> borrow area has multiple cut geometries, which will reduce the potential of encountering <br /> rock. The depth of the cuts vary from - 11 feet NGVD to - 16 feet NGVD . The Contractor <br /> shall not excavate material from outside the horizontal or vertical dredge delineations. <br /> Testing of Fill Material <br /> The Site Representative shall collect samples of the beach fill material placed along the <br /> project shoreline to ensure the material being placed by the Contractor is within the <br /> project specifications and adheres to the material quality standards as outlined by Rule <br /> 6213-41 . 007(2)(j), F.A.C. Testing shall consist of visual observations and samples to be <br /> analyzed through standard laboratory procedures. <br /> 3 <br />