Laserfiche WebLink
Contract SF61 lAA <br /> Amendment #2 <br /> Project Description/ Estimated Timeframes <br /> Project Name Location Tasks Cost Start Com lete <br /> J Immediately upstream of the Install floating debris booms <br /> a <br /> Pro ' ect No. A-5 : <br /> across <br /> Floating debris booms in proposed South Relief Canal the canal to trap floating solids . <br /> South Relief Canal (This vortex treatment system) The collected solids will bek <br /> project will be designed and continuously removed using <br /> nl <br /> . . ' <br /> constructed concurrently with mechanical equipment . <br /> the Vortex-type treatment Design and Permitting (5 ) See times for Project <br /> system in the South Relief A-7 <br /> Canal) Land Acquisition ( 1 ) N/A I N/A <br /> Construction ( 5 ) See times for Project <br /> Project No. A-6 : Vortex-type Main Relief Canal . � � <br /> The County Construct a treatment facility <br /> treatment system in the Main will locate this structure as far ( vortex units and traveling bar ,, , . •_ ' <br /> Relief Canal downstream as practical . (A screens) to remove floating solids <br /> potential location is in the diverted into the facility by the ;m <br /> vicinity of the existing spillway floating debris boom and to remover <br /> structure , north of the County sediments in medium to small <br /> Administration Building and flows . <br /> south of the Vero Beach Design and Permitting $ 1659000 complete by 12/2005 <br /> Municipal Airport . ) Land Acquisition ( 1 ) N/A I N/A <br /> Construction $ 39500,000 nine months <br /> = 1 u <br /> 11 <br /> Pro outh Relief Canal . The C ° <br /> Construct a treatment facility ° <br /> J yp S <br /> ect No. A -7 : Vortex-t e t <br /> treatment system in the South County will locate this structure (vortex units and traveling bar " , <br /> Relief Canal as far downstream as practical . screens) to remove floating solids ' ' " '°�`"� : <br /> diverted into the facility by the <br /> E "k <br /> floating debris boom and to remove <br /> .r <br /> medium to small flows . UN <br /> u> ° z• <br /> Design and Permitting $ 165 ,000 complete by 12/2005 <br /> Land Acquisition ( 1 ) N/A I N/A <br /> Construction $2, 7509000 nine months <br /> Page 6 of 9 <br />