My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-192
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 9:20:57 AM
Creation date
9/30/2015 8:51:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
06/07/2005
Control Number
2005-192
Agenda Item Number
7.X.
Entity Name
St. Johns River Water Management District
Subject
Amendment No.2 to Memorandum of Understanding
Sediment, Flow Reduction , Water Improvements
Agreement January 15, 2002, Amendment No1 February 18,2003
Area
Indian River Lagoon
Supplemental fields
SmeadsoftID
4986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract SF61 lAA <br /> Amendment #2 <br /> Project Description/ Estimated Timeframes <br /> Project Name Location Tasks Cost Start Com lete <br /> J Immediately upstream of the Install floating debris booms <br /> a <br /> Pro ' ect No. A-5 : <br /> across <br /> Floating debris booms in proposed South Relief Canal the canal to trap floating solids . <br /> South Relief Canal (This vortex treatment system) The collected solids will bek <br /> project will be designed and continuously removed using <br /> nl <br /> . . ' <br /> constructed concurrently with mechanical equipment . <br /> the Vortex-type treatment Design and Permitting (5 ) See times for Project <br /> system in the South Relief A-7 <br /> Canal) Land Acquisition ( 1 ) N/A I N/A <br /> Construction ( 5 ) See times for Project <br /> Project No. A-6 : Vortex-type Main Relief Canal . � � <br /> The County Construct a treatment facility <br /> treatment system in the Main will locate this structure as far ( vortex units and traveling bar ,, , . •_ ' <br /> Relief Canal downstream as practical . (A screens) to remove floating solids <br /> potential location is in the diverted into the facility by the ;m <br /> vicinity of the existing spillway floating debris boom and to remover <br /> structure , north of the County sediments in medium to small <br /> Administration Building and flows . <br /> south of the Vero Beach Design and Permitting $ 1659000 complete by 12/2005 <br /> Municipal Airport . ) Land Acquisition ( 1 ) N/A I N/A <br /> Construction $ 39500,000 nine months <br /> = 1 u <br /> 11 <br /> Pro outh Relief Canal . The C ° <br /> Construct a treatment facility ° <br /> J yp S <br /> ect No. A -7 : Vortex-t e t <br /> treatment system in the South County will locate this structure (vortex units and traveling bar " , <br /> Relief Canal as far downstream as practical . screens) to remove floating solids ' ' " '°�`"� : <br /> diverted into the facility by the <br /> E "k <br /> floating debris boom and to remove <br /> .r <br /> medium to small flows . UN <br /> u> ° z• <br /> Design and Permitting $ 165 ,000 complete by 12/2005 <br /> Land Acquisition ( 1 ) N/A I N/A <br /> Construction $2, 7509000 nine months <br /> Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.