Laserfiche WebLink
Contract SF611 A <br /> Amendment #2 <br /> Project Description/ Estimated Timeframes <br /> Project Name Location Tasks Cost Start Com Tete <br /> E ( 5 . e . , t Y. :.4 'ten"r�h n . . � M1b in' x;'[ ✓ yr y q. <br /> Project No. A- 8 : Southeast corner of 4th Street Construct a treatment/storage <br /> Egret Marsh Regional and 74th Avenue facility . If a proposed power plant r? <br /> Stormwater Park (formerly is constructed , it will use some of r . <br /> known as the Southwest the stored water from the <br /> Industrial Stormwater Reuse stormwater park for process cooling <br /> Node) — Phase I (35 acre water. In addition to meeting the <br /> reservoir system) needs of the stormwater treatment <br /> system, the reservoir will be sized .. <br /> for the built-out power plant :: .a, <br /> cooling water requirements . (First <br /> phase of a multiphase project) <br /> Design and Permitting $220,000 4/2004 12/2005 <br /> Land Acquisition (Phase I) ( 2) N/A N/A <br /> Construction <br /> Phase I $29200,000 2/2006 8/2006 <br /> Phase II $50000 4/2006 10/2006 <br /> r t •.hd. . V R s E fl" "W3F.d 33 3 e i 'Yx t r e , <br /> a 7I1 T <br /> R 'd re <br /> Page 7 of 9 <br />