My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-192
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 9:20:57 AM
Creation date
9/30/2015 8:51:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
06/07/2005
Control Number
2005-192
Agenda Item Number
7.X.
Entity Name
St. Johns River Water Management District
Subject
Amendment No.2 to Memorandum of Understanding
Sediment, Flow Reduction , Water Improvements
Agreement January 15, 2002, Amendment No1 February 18,2003
Area
Indian River Lagoon
Supplemental fields
SmeadsoftID
4986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract SF611AA <br /> Amendment #2 <br /> B . PART B — CONSTRUCTION WITHIN THE NORTH RELIEF CANAL BASIN <br /> Project No. B- 1 : Modify the North Relief Canal near 58th The existing radial arm gate <br /> existing radial arm gate Avenue structure consists of three discrete <br /> structure at the North Relief radial arm gates . The middle radial r" , <br /> Canal arm gate is set approximately one- <br /> foot below the other two gates and `" Mk <br /> serves as an overflow weir. When <br /> the radial arm gates are opened, <br /> settled solids immediately upstream <br /> of the gate are re -suspended and <br /> discharged into the Indian River <br /> Lagoon . This project will replace <br /> one of the radial arm gates with a <br /> tilting-type weir gate . Purpose : ( 1 ) <br /> to provide more accurate water <br /> level control , ( 2) to allow more <br /> h u <br /> water to be retained upstream of the <br /> structure, and ( 3 ) to minimizew ; <br /> release of settled solids when the <br /> water level is lowered . <br /> g g $ 16271 5/ 15/200 <br /> '3 <br /> Design Permitting , <br /> n 3 complete <br /> Land Acquisition ( 1 ) N/A N/A <br /> Construction $ 173 ,064 . 78 10/2003 10/2005 <br /> B � . I • .. •€F. ,.' r . ':., r � .. . . ".,.. ; . . '3. «. . ... a. r sew.' ',�'` <br /> ' .`3 ..' <br /> Project No. mmediately upstream of the Install floating debris booms across <br /> A <br /> Floating debris booms in the proposed North Relief Canal the canal to trap floating solids . " <br /> North Relief Canal (This vortex treatment system) Periodically clean using mechanical <br /> ro ect will be designed andequipment . <br /> J g <br /> project <br /> constructed concurrently withthe Veftex type treatment Design and Permitting (5 ) See times for <br /> Project B - <br /> 3 <br /> system in the North Relief Land Acquisition ( 1 ) N/A N/A <br /> Canal) Construction <br /> (5 ) See times for Project B - <br /> K <br /> e "<" a r <br /> Me 141q <br /> MIP JW1 <br /> Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.