My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-166
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 2:19:29 PM
Creation date
9/30/2015 7:51:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/20/2004
Control Number
2004-166
Agenda Item Number
7.B.
Entity Name
Nations Fence Inc.
Subject
Security Fencing South County RO Plant
Area
1550 9th St. SW
Bid Number
6079
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
4184
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR agrees to remedy promptly and without cost to OWNER, any defective materials <br /> or workmanship that appear within one (1) year from the date of completion of the work. <br /> No provision contained in these Specifications shall be held to limit CONTRACTOR ' S liability <br /> for defects to less than the legal limit of liability in accordance with law . <br /> No provision contained in these Specifications shall be held to limit the terms and conditions of <br /> the Manufacturer's Warranty and CONTRACTOR shall secure parts , materials and equipment to <br /> be installed with Manufacturer's full warranty as to parts and service for one (1) year wherever <br /> possible . <br /> 9 . ASBUILT DRAWING REQUIREMENTS <br /> 1 Prior to Final Acceptance, the CONTRACTOR shall submit to the OWNER two (2) sets of <br /> Asbuilt Plans . This plan set shall show the exact way in which the installation was constructed, <br /> I including all changes during the course of the project . As a minimum, the plan set shall show the <br /> following : <br /> The CONTRACTOR shall correct any errors to the As-Built plans upon review by the <br /> ENGINEER before Final Acceptance is complete . <br /> ' 10. NOTICES <br /> Notices to the CONTRACTOR pursuant to these Specifications shall be deemed to have been <br /> 1 properly sent when mailed to the CONTRACTOR at the address provided on the bid form . <br /> ' Notices to the County shall be deemed to have been properly notified when mailed to the Erik <br /> Olson, Director Indian River County Utilities Department, 1840 25th Street, Vero Beach, Florida <br /> 32960 , <br /> 11 . DISPUTE <br /> Except as otherwise provided in this contract, any dispute concerning a question of fact or of <br /> interpretation of a requirement of the contract which is not disposed of by mutual consent <br /> between the parties shall be decided by the Utilities Director, who shall reduce the decision to <br /> writing and furnish a copy thereof to the parties . In connection with any dispute proceeding under <br /> this clause , the party shall be afforded an opportunity to be heard and to offer evidence in support <br /> of its version of the facts and interpretation of the contract . <br /> iThe Utilities Director shall make such explanation as may be necessary to complete, explain or <br /> make definite the provisions of this contract and the findings , and conclusions shall be final and <br /> binding on both parties . Pending the final decision of a dispute thereunder, CONTRACTOR shall <br /> proceed diligently with its performance of the contract in accordance with the preliminary <br /> directions of the Utilities Director. <br /> r <br /> Page 11 of 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.