Laserfiche WebLink
6 .05 Substitutes and "Or-Equals " <br /> b. CONTRACTOR shall submit sufficient <br /> ' Paragraph 6.05.A has been deleted and replaced with a information as provided below to allow ENGI- <br /> new paragraph. See the Supplementary Conditions. NEER to determine that the item of material or <br /> equipment proposed is essentially equivalent to <br /> that named and an acceptable substitute therefor. <br /> ' Requests for review of proposed substitute items <br /> Supplier-, the speeifieafien er- deser-ipfim. is intended We of material or equipment will not be accepted by <br /> estahnsl; thp. -ype;fiffletiei% appeaFanee, and quahty ENGINEER from anyone other than CON- <br /> TRACTOR, <br /> equal" :.e.m. eF He ..ubst utie„ is pe...ai#eEi a dor i c. The procedure for review by ENGI- <br /> NEER will be as set forth in paragraph <br /> ' <br /> Suppliers may be submitted te EINCA EE fer- 6.05 .A.2.d, as supplemented in the General <br /> under- the e4mfflMmM*�;;4;e-,eass desefibed below. Requirements and as ENGINEER may decide is <br /> appropriate under the circumstances. <br /> ' 1 . "Or-Equal " Items: If in ENGINEER's <br /> sole discretion an item of material or equipment pro- d. CONTRACTOR shall first make written <br /> posed by CONTRACTOR is functionally equal to application to ENGINEER for review of a <br /> that named and sufficiently similar so that no change proposed substitute item of material or <br /> ' in related Work will be required, it may be con- equipment that CONTRACTOR seeks to furnish <br /> sidered by ENGINEER as an "or-equal" item, in or use. The application shall certify that the <br /> which case review and approval of the proposed proposed substitute item will perform adequately <br /> ' item may, in ENGINEER's sole discretion, be the functions and achieve the results called for <br /> accomplished without compliance with some or all by the general design, be similar in substance to <br /> of the requirements for approval of proposed substi- that specified, and be suited to the same use as <br /> tute items. For the purposes of this paragraph that specified. The application will state the <br /> 6.05 .A. 1 , a proposed item of material or equipment extent, if any, to which the use of the proposed <br /> will be considered functionally equal to an item so substitute item will prejudice CONTRACTOR's <br /> named if: achievement of Substantial Completion on time, <br /> ' whether or not use of the proposed substitute <br /> Sentence 6.05.A.1 .a.(ii) has been deleted and replaced item in the Work will require a change in any of <br /> with a new sentence. See the Supplementary the Contract Documents (or in the provisions of <br /> ' Conditions. any other direct contract with OWNER for work <br /> a. in the exercise of reasonable judgment on the Project) to adapt the design to <br /> the <br /> ENGINEER determines that: (i) it is at least proposed substitute item and whether or not <br /> equal in quality, durability, appearance, strength, incorporation or use of the proposed substitute <br /> ' and design characteristics; (ii) it v41r-ehab item in connection with the Work is subject to <br /> pe; feFm -at least equally mie.l} dh payment of any license fee or royalty. All <br /> variations of the proposed substitute item from <br /> ' that specified will be identified in the applica- <br /> tion, and available engineering, sales, <br /> b. CONTRACTOR certifies that: (i) there is maintenance, repair, and replacement services <br /> no increase in cost to the OWNER; and (ii) it will be indicated. The application will also <br /> ' will conform substantially, even with deviations, contain an itemized estimate of all costs or <br /> to the detailed requirements of the item named in credits that will result directly or indirectly from <br /> the Contract Documents. use of such substitute item, including costs of <br /> ' redesign and claims of other contractors affected <br /> 2. Substitute Items by any resulting change, all of which will be <br /> considered by ENGINEER in evaluating the <br /> a. If in ENGINEER' s sole discretion an proposed substitute item. ENGINEER may <br /> ' item of material or equipment proposed by require CONTRACTOR to furnish additional <br /> CONTRACTOR does not qualify as an data about the proposed substitute item. <br /> "or-equal" item under paragraph 6.05 .A. 1 , it will <br /> be considered a proposed substitute item <br /> 00700 - 21 <br />