My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-310
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:40:48 PM
Creation date
9/30/2015 7:04:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2003
Control Number
2003-310
Agenda Item Number
7.U.
Entity Name
Sheltra & Son Construction
Subject
26th St. Bridge Replacement Contract and Specifications
Area
26th St.
Project Number
0378
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3502
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> r <br /> SECTION 01009 <br /> SPECIAL PROVISIONS <br /> 1 . 1 GENERAL <br /> A . Visits to the construction site may be made by representatives of permitting or <br /> governing bodies . Submit details of all instructions from the above to the <br /> ENGINEER immediately. The Work will not be accepted by the OWNER until final <br /> acceptance has been received from the various Regulatory Agencies having <br /> jurisdiction . <br /> Be Furnish sufficient labor, construction equipment and materials , and work such <br /> hours , including night shifts and overtime operations , as may be necessary to insure <br /> the prosecution of the work in accordance with the approved progress schedule . If, <br /> in the opinion of the ENGINEER , the CONTRACTOR falls behind the progress <br /> schedule , take such steps as may be necessary to improve progress , all without <br /> additional cost to the OWNER . The ENGINEER shall be compensated for his <br /> overtime services in accordance with the Supplementary Conditions . <br /> 1 . Failure to comply with the requirements of the ENGINEER under this <br /> provision shall be grounds for determination by the ENGINEER that the <br /> CONTRACTOR is not prosecuting the work with such diligence as will insure <br /> completion within the time specified . Upon such determination , the <br /> ENGINEER may recommend to the OWNER to seek such legal remedy as is <br /> deemed necessary to protect the OWNER' s interest . <br /> C . All salvageable material and equipment for which specific use , relocation or other <br /> disposal is not specifically noted , shall remain the property of the OWNER and shall <br /> be delivered to the OWNER at the following location : Indian River County Road and <br /> Bridge Facility at 4550 41St Street , Vero Beach , Florida , at the CONTRACTOR' s <br /> expense . All material and equipment not in salvageable condition , as determined <br /> by the ENGINEER and the OWNER , shall be disposed of bythe CONTRACTOR , at <br /> the CONTRACTOR's expense . <br /> D . Requirements of Permits or Grants : In addition to these Specifications , all work shall <br /> comply with the requirements of local permitting agencies , St. Johns River Water <br /> Management District , Florida Department of Environmental Protection , Florida <br /> Department of Transportation , and all other state or federal agencies ' permit or <br /> grant requirements . If there is a conflict between the Specifications and any permit <br /> r or grant requirement, then the most stringent specification or requirement shall <br /> govern . In any event , the ENGINEER shall determine which specification or <br /> requirement governs , and the ENGINEER' s decision shall be final . <br /> Last revised 12/10/02 01009- 1 PROJECT <br /> F:\Engineering\Capital Projects\0378-26th Street Bridge\0378-26th Street Bridge CONTRACT DOC\0378-01009 - Special <br /> ' Provisions.doc <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.