Laserfiche WebLink
E . Other Specifications and Requirements : In some instances , the Specifications <br /> contained herein may refer to other requirements or specifications (such as FDOT's <br /> Standard Specifications for Road and Bridge Construction ) . If there is a conflict <br /> between the Specifications and any referenced specification or requirement , then <br /> the most stringent specification or requirement shall govern . In any event , the <br /> ENGINEER shall determine which specification or requirement governs , and the <br /> ENGINEER' s decision shall be final . <br /> ' F . Notify all permitting agencies of intention to begin construction . Give proper <br /> notification within the time frame required by the agency. <br /> G . Give the ENGINEER ten ( 10 ) days minimum notice before beginning work on the <br /> Project . <br /> H . Give the ENGINEER a minimum of 48 hours notice before performing any test . <br /> I . Before performing any work outside the designated limits of the work site , secure <br /> any necessary permits and authorization from the applicable owner, or verify in <br /> writing that such has been previously obtained . Follow all requirements of any said <br /> permits or authorization . Give the ENGINEER and appropriate ownerten ( 10 ) days <br /> minimum notice before commencing construction operations outside the designated <br /> limits of the work site . <br /> J . Do not work overtime unless authorized to do so by OWNER . If overtime is <br /> required , provide 48 hours minimum notice to the ENGINEER . <br /> K . Do not perform any work on holidays or weekends that requires inspection by the <br /> ENGINEER or OWNER , without first obtaining the OWNER' s written permission . <br /> L . Anything mentioned in the Specifications and not shown in the Drawings , or shown <br /> in the Drawings and not mentioned in the Specifications , shall be of like effect as if <br /> shown or mentioned in both . <br /> M . The items of work on this project are to proceed in the sequence listed in Section <br /> 1 01014 , " Maintenance of Operations " and shall be operable within the time frame <br /> stated from the date of the Notice to Proceed . Do not start any work that involves <br /> modification to existing facilities , until written approval and authorization has been <br /> ' received from the OWNER or his designated representative . Afterwritten approval <br /> and authorization has been received , give the OWNER a minimum of 48 hours <br /> advance notice before starting any work that involves modifications to existing <br /> ' facilities . <br /> + + END OF SECTION + + <br /> Last revised 7/6/01 01009-2 PROJECT <br /> F:\Engineering\Capital Projects\0378-26th Street Bridge\0378-26th Street Bridge CONTRACT DOC\0378-01009 - Special <br /> Provisions .doc <br />