My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-144
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2016 1:43:56 PM
Creation date
10/1/2015 12:09:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/06/2008
Control Number
2008-144
Agenda Item Number
12.J.2
Entity Name
Sheltra & Son Construction
Subject
Change Order No.2 Vero Lakes Estates Master Planned Water Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Supplemental fields
SmeadsoftID
7010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERO LAKE ESTATES 12" MASTER PLAN WATER MAIN <br /> 11 -9-07 Phase I — Bid Opening <br /> 11 - 13-07 Amendment No . 1 to Work Order No . 4 , SBS add additional fire protection <br /> mains on 87th 83`d 79th between 104th Ave and 105"' Ave , Approved BCC <br /> 11 -20-07 Phase I — Award project to Sheltra and Sons , $968 , 328 . 00 . <br /> Change Order No . 1 — (Amendment No . 1 ) fire protection mains <br /> Sheltra and Sons , $ 103 , 248 . 00 <br /> Contract Price $ 1 , 071 , 576 . 00 <br /> 11 -26-07 Public Works Change Order 2 for installation of 12" Water Main , <br /> 79th St. ( 106th Ave to 101St Ave ) <br /> 87th St. ( 106th Ave to 102"d Ave) Lump Sum $ 124 , 358 . 00 <br /> 1 -3-08 Shetra and Sons - Notice to Proceed-240 days . Complete 9-2-08 <br /> 1 - 10-08 Phase II — Bid Opening <br /> 1 - 14-08 Right of Way Permit issued Phase 1 <br /> 1 -28-08 Phase II — Award project to Tim Rose Construction , $471 , 450. 00 <br /> 3-4-08 Tim Rose Contracting , Notice to Proceed- 120 days . Complete 07-02-08 <br /> There are five directional bore changes for a total of 188' . <br /> Sta . 79+ 18 — 91St Ave at Drainage Canal , Additional 20' due to of 12" HDPE for depth of <br /> bore under drainage canal . <br /> Sta . 102+23 — 91 st Ave at 85th Place , Additional 12 ' to carry beyond drainage pipe . <br /> Sta . 108+89 — 85th Place at CR 510 , Additional 46' due to close drainage pipe , distance <br /> for set-up needed for bore machine and necessity to reverse tap at CR510 . <br /> Sta . 839+72 — 104th Ave at CR 512 , Additional 15 ' necessary for reverse tap at CR512 . <br /> Sta . 233+32 — 79th Street at 101St Ave , Additional 95' necessary to avoid open cutting a <br /> paved road . 101St Ave is a paved road shown as dirt on the construction drawing . <br />
The URL can be used to link to this page
Your browser does not support the video tag.