Laserfiche WebLink
Exhibit "A" <br />No. <br />Location <br />Bid <br />New <br />Change <br />New Cost <br />Less +++ <br />Total Change <br />Ft <br />Ft <br />Deducts <br />Cost <br />1* <br />79+18 <br />150' <br />170' <br />20' <br />$1,880.00($540.00) <br />$1,340.00 <br />2** <br />102+23 <br />70' <br />82' <br />12 <br />$1,128.00 <br />($324.00) <br />$ 804.00 <br />3*** <br />108+89 <br />68' <br />114' <br />46' <br />$4,324.00 <br />$1,242.00 <br />$35082.00 <br />4+ <br />839+72 <br />60' <br />75' <br />15' <br />$1,410.00 <br />$405.00 <br />$1,005.00 <br />5 ++ <br />233+32 <br />0' <br />95' <br />95' <br />$8,930.00 <br />($4,211.40) <br />$4,718.60 <br />$17,672.00 <br />($65722.40) <br />$10,949.60 <br />• ` Additional footage due to inflexibility of 12" HDPE for depth of bore under <br />drainage canal <br />• *' Additional footage to carry beyond drainage pipe <br />• "` Additional footage result of close drainage pipe, distance needed for bore <br />machine and necessity to reverse tap at CR510 <br />• + Additional footage necessary for reverse tap at CR512 <br />++ Additional bore necessary for recently paved road. <br />+++ Deduction for PVC, sod and asphalt not installed due to change in pipe <br />distance. <br />