My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-354
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:09:25 AM
Creation date
10/1/2015 12:49:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-354
Agenda Item Number
8.V.
Entity Name
Sheltra & Son Construction
Subject
12th. St. sidewalk
Area
43rd. Avenue to 27th Avenue
Project Number
0604
Bid Number
2008080
Supplemental fields
SmeadsoftID
7695
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
subsequent inspections , tests , or approvals taken after initial failing <br /> inspections , tests , or approvals . <br /> SC- 14 . 02 . C . 1 . Delete paragraph GC44 . 02. C. 1 in its entirety and insert the following <br /> paragraph in its place : <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the Local <br /> Government Prompt Payment Act, F . S . 218 .70 et. seq . <br /> SC- 14 . 04A . After the third sentence in paragraph GC- 14. 04A of the General Conditions, <br /> delete the remainder of paragraph 14. 04A in its entirety and replace with the following: <br /> " If Engineer considers the Work substantially complete , Engineer will prepare <br /> and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br /> the date of Substantial Completion . In accordance with the provisions of Florida <br /> Statutes section 208 . 735 (7 ) (a) (2005) , upon receipt of the tentative certificate of <br /> Substantial Completion from Engineer, the Owner, the Engineer, and the <br /> Contractor shall conduct a walk-through inspection of the Project to document a <br /> list of any items required to render the Work on the Project complete , <br /> satisfactory , and acceptable under this Agreement (herein the " Statutory List" ) . <br /> The Statutory List shall be reduced to writing and circulated among the Owner, <br /> the Engineer, and the Contractor by the Owner or the Engineer within 30 <br /> calendar days after substantial completion . The Owner and Contractor <br /> acknowledge and agree that: 1 ) the failure to include any corrective work , or <br /> pending items that are not yet completed , on the Statutory List does not alter the <br /> responsibility of the Contractor to complete all of the Work under this Agreement; <br /> 2) upon completion of all items on the Statutory List, the Contractor may submit a <br /> pay request for all remaining retainage except as otherwise set forth in this <br /> Agreement; and 3) any and all items that require correction under this Agreement <br /> and that are identified after the preparation of the Statutory List remain the <br /> obligation of the Contractor to complete to the Owner's satisfaction under this <br /> Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br /> acknowledges and agrees that it will diligently proceed to complete all items on <br /> the Statutory List and schedule a final walk-through in anticipation of final <br /> completion on the Project . " <br /> SC- 14 . 0413 Add the following new paragraph immediately after paragraph GC 14. 048: <br /> C . At the time of delivery of the tentative certificate of Substantial Completion , Engineer will <br /> deliver to Owner and Contractor a written recommendation as to division of responsibilities <br /> pending final payment between Owner and Contractor with respect to security , operation , <br /> safety , and protection of the Work, maintenance , heat , utilities , insurance , and warranties and <br /> guarantees <br /> SC -14. 07 Final Payment <br /> SC- 14 . 07 . C . 1 . Delete paragraph GC- 14. 07. C. 1 in its entirety and insert the following <br /> paragraph in its place: <br /> C . Payment Becomes Due <br /> 0o800-s <br /> 00800 - Supplementary Conditions <br /> nn.Qnn Rrdcn.dnanrinn\ftanitoi Prniortc\nM4-12th St Sidewalk Imorove between 43rd Ave 8 27th Ave\Bid Documents\00800 - Supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.