Laserfiche WebLink
Item No. 120-6 - Embankment - Per Cubic Yard <br />SECTIO <br />UABII <br />A. Sub Article 160-5.1 is modified by the addition of the following: <br />"The stabilization thickness indicated on plans shall be considered a minimum <br />thickness. Thickness will vary to conform to the lines, and grades shown in the <br />plans." Minimum L.B.R. = 40 - No under -tolerance. <br />B. Payment shall be made under: <br />Item No. 160-4 - Type B Stabilization (12") - Per Square Yard <br />SECTION 00285 OPTIO? <br />A. Sub Article 2854 is modified by the addition of the following: <br />Base material, thickness and requirements are described in the construction plans. <br />Only one type of alternate base material shall be used. No additional payment will <br />be made for base thickness in excess of the specified thickness <br />B. Payment shall be made under: <br />Item No. 285-707 - Base Group 7 - Per Square Yard <br />TURNO <br />Sub Article 286-6 is modified by the addition of the following: <br />The cost of any bituminous material used in hot bituminous mix, form work, prime coat or <br />tack coat, or any incidental labor or material shall not be paid for separately. <br />Payment shall be made under: <br />Item No. 286-1-1 - Turnout Construction (Asphalt) - Square Yard <br />N0 <br />WHALTIC 1 <br />A. Subarticle 334-10 is modified by the addition of the following: <br />GENERAL PROVISIONS <br />01025-9 <br />F:\Engineering\Capital Projects\0604-12th St Sidewalk Improve between 43rd Ave & 27th Ave\Bid Documents\DIVISION 2 - Technical <br />Provisions.doc <br />