Laserfiche WebLink
No additional payment will be made for tonage in excess of the specified in-place <br />density and tonnage. <br />B. Payment shall be made under: <br />Item No. 334-1-13 — Superpave Asphaltic Concrete — Ton. <br />SECTION 00425 INLETS, MANHOLES AND JUNCTION BOXES <br />A. MODIFICATION OF EXISTING STRUCTURES: Price shall include all work <br />associated with modifying the existing drainage structure(s) as depicted in the <br />Plans and in accordance with Section 425. <br />Payment shall be made under: <br />Item No. 425-72 - Modify Inlet - Per Each <br />B. Drainage structures indicated to be utility conflict manholes shall be constructed in <br />accordance with Indian River County Department of Utility Services Water and <br />Wastewater Utility Standards. Cost of such structures shall include all labor and <br />material necessary. <br />Payment shall be made under: <br />Item No. 425-1459 — Inlets, Curb (Type J-5) (Conflict) - Per Each <br />Item No. 425-2-74 — Manholes (type J-7) (Conflict) - Per Each <br />Item No. 425-2-94 — Manholes (Type J-8) (Conflict) - Per Each <br />C. MANHOLES: Price shall include all work associated with constructing and <br />installing manholes and covers. The covers shall have raised letters, cast in the <br />cover stating "STORM SEWER". <br />SECTION 00430 _ _ PIPE CULVERTS AND STORM SEWERS <br />A. CONCRETE PIPE CULVERT (CLASS III): Concrete pipe culvert shall be Class III <br />and constructed in accordance with ASTM Designation C-76, Class III, Wall B. <br />Any select bedding needed to stabilize pipe to be #57 or #4 rock. Select bedding <br />will be included in the cost of the pipe. Minimum bedding depth to be 18" and <br />minimum width to be diameter of pipe. Cost of removal of unsuitable material and <br />replacement with suitable material beneath 18" bedding shall be paid for as subsoil <br />excavation item no. 120-4. <br />The work under this section shall include all materials, excavation, backfilling, <br />tamping and disposal of surplus material. All required sheeting is to be included in <br />GENERAL PROVISIONS <br />01025-10 <br />F:\Engineering\Capital Projects\0604-12th St Sidewalk Improve between 43rd Ave & 27th Ave\Bid Documents\DIVISION 2 -Technical <br />Provisions.doc <br />