My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:42:51 PM
Creation date
10/1/2015 1:02:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th Street SW amd 43rd Ave/ Bridge Replacement
Area
5th St.SW amd 43rd Ave/
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8044
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL <br />Public Entity Crimes: Have been removed from the Contract Documents, however on page 00310-8, <br />paragraph 7.01 — C. Statement of Public Crimes, was inadvertently not deleted from this form. Please <br />ignore this Statement. <br />PRE-BID MEETING September 3, 2008 (Questions, clarifications, corrections and changes): <br />Clarification / Correction: The Itemized Bid Schedule and Division 2 Technical Provisions in the <br />Contract Documents and Specifications shall be amended by replacing the attached revised Itemized Bid <br />Schedule and revised Division 2 Technical Provisions. <br />Question 1. Is the intersection of 43`d Avenue and 5h Street SW intended to be widened with an overlay <br />or reconstructed? <br />Answer. The intersection is intended to be reconstructed. The plans were revised to clarify the intent. In <br />addition, the plans and Itemized Bid Schedule were amended by including additional sheets showing a <br />temporary road that is to be constructed during the reconstruction of the intersection. (See revised 43rd <br />Avenue and 5th Street Roadway Widening Plans, Sheets 1, 11, 12, 13, 14, 15, 16, 17, 20, 55, 56, 57) <br />Question 2. There are signal mast arm items indicated in the Itemized Bid Schedule under the Traffic <br />Signal Section that are not indicated on the plans. <br />Answer. The mast arms are intended to be included in the future, not part of this contract. The items were <br />taken out of the Itemized Bid Schedule. <br />Question 3. Line Item series 710 in the Itemized Bid Schedule should be series 711 for Thermo Plastic <br />pavement markings. <br />Answer. The pavement markings are intended to be thermo plastic. The line item series 710 were revised <br />to series 711 (See revised Itemized Bid Schedule), <br />Question 4. Line item 44041 50 UNDERDRAIN PIPE TYPE V, 4" SMOOTH quantity 1104 Linear Feet <br />appears to be too high. <br />Answer. The Plans and Itemized Bid Schedule were amended to indicate the correct length of piping. (See <br />revised plans and revised Itemized Bid Schedule). <br />Question 5. Provide more information on the cross sections for the canal Rubble Riprap installation. <br />Answer. Sheet A5 of the 5th Street Bridge plans shows the general configuration of the rubble riprap <br />installation. Sheets 27 and 28 of the 43rd Avenue and 5ffi Street Road widening plans show the existing <br />cross sections of the canal. <br />Page 2 of 3 <br />F:IEngineeringl Capital projects10206 5th ST SW & 43rd AVE Bridge Replacement & Roadway ImprovementslAddendum #3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.