My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:46:49 AM
Creation date
10/1/2015 1:02:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th Street SW amd 43rd Ave/ Bridge Replacement
Area
5th St.SW amd 43rd Ave/
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8044
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL <br /> Public Entity Crimes : Have been removed from the Contract Documents, however on page 00310- 8 , <br /> paragraph 7 . 01 — C . Statement of Public Crimes, was inadvertently not deleted from this form. Please <br /> ignore this Statement. <br /> PRE-BID MEETING September 3 , 2008 (Questions, clarifications, corrections and changes) : <br /> Clarification / Correction : The Itemized Bid Schedule and Division 2 Technical Provisions in the <br /> Contract Documents and Specifications shall be amended by replacing the attached revised Itemized Bid <br /> Schedule and revised Division 2 Technical Provisions . <br /> Question 1 . Is the intersection of 43 `d Avenue and 5h Street SW intended to be widened with an overlay <br /> or reconstructed? <br /> Answer. The intersection is intended to be reconstructed. The plans were revised to clarify the intent. In <br /> addition, the plans and Itemized Bid Schedule were amended by including additional sheets showing a <br /> temporary road that is to be constructed during the reconstruction of the intersection. (See revised 43rd <br /> Avenue and 5th Street Roadway Widening Plans, Sheets 1 , 11 , 12 , 13 , 14, 15 , 16 , 17 , 20 , 55 , 56 , 57) <br /> Question 2 . There are signal mast arm items indicated in the Itemized Bid Schedule under the Traffic <br /> Signal Section that are not indicated on the plans . <br /> Answer. The mast arms are intended to be included in the future, not part of this contract. The items were <br /> taken out of the Itemized Bid Schedule. <br /> Question 3 . Line Item series 710 in the Itemized Bid Schedule should be series 711 for Thermo Plastic <br /> pavement markings . <br /> Answer. The pavement markings are intended to be thermo plastic. The line item series 710 were revised <br /> to series 711 (See revised Itemized Bid Schedule) . <br /> Question 4 . Line item 44041 50 UNDERDRAIN PIPE TYPE V, 4" SMOOTH quantity 1104 Linear Feet <br /> appears to be too high. <br /> Answer. The Plans and Itemized Bid Schedule were amended to indicate the correct length of piping. (See <br /> revised plans and revised Itemized Bid Schedule) . <br /> Question 5 . Provide more information on the cross sections for the canal Rubble Riprap installation. <br /> Answer. Sheet A5 of the 5t' Street Bridge plans shows the general configuration of the rubble riprap <br /> installation. Sheets 27 and 28 of the 43rd Avenue and 5ffi Street Road widening plans show the existing <br /> cross sections of the canal . <br /> Page 2 of 3 <br /> F:IEngineeringl Capital Projects10206 5th ST SW & 43rd AVE Bridge Replacement & Roadway ImprovementslAddendum #3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.