My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:42:51 PM
Creation date
10/1/2015 1:02:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th Street SW amd 43rd Ave/ Bridge Replacement
Area
5th St.SW amd 43rd Ave/
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8044
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Question 6. Can 5t' Street SW west of 43rd Avenue be closed for the installation of the 48" RCP? <br />Answer. There will be no 48" culvert crossing of 5h Street west of 43rd Avenue. The 48" RCP runs <br />parallel to the road far enoup from the roadway to not require a road closure. Therefore, no road closure <br />of 5h Street SW west of 43t Avenue will be permitted. <br />Attachments. Itemized Bid Schedule, Revised 10-2-08 <br />Division 2 Technical Provisions, Revised 10-2-08 <br />Revised plans for 43rd Avenue and 50' Street SW, Roadway Widening, <br />Sheets 1, 11,12, 13,14, 15, 16, 17, 20, 55, 56, 57 <br />ADDENDUM NO.3 is submitted by <br />Company Name <br />Name: <br />.E., Roadway Production Manager <br />(Type / Printed) <br />Authorized Signature: <br />Telephone: <br />..J�f..J �► . . <br />i a _�IS7q q �j /�� Fax: �� 6772 <br />Page 3 of 3 <br />F:IEngineeringl Capital Projects10206 5th ST SW & 43rd AVE Bridge Replacement & Roadway ImprovementslAddendum #3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.